background image

Operating instructions

K3G310-AV52-06

Translation of the original operating instructions

Fig. 3: Example illustrating vibration measurement. The arrangement of
the sensors depends on the device concerned and the installation
situation.

6.2 Cleaning

NOTE
Damage to the device during cleaning

Malfunction possible
→ Do not clean the device using a water jet or high-pressure

cleaner.

→ Do not use any acid, alkali or solvent-basedcleaning

agents.

→ Do not use any pointed or sharp-edged objects for cleaning

6.3 Safety inspection

NOTE
High-voltage test

The integrated EMC filter has Y capacitors. The tripping current
is exceeded when AC testing voltage is applied.
→ Test the device with DC voltage when you perform the

legally required high-voltage test. The voltage to be used
corresponds to the peak value of the AC voltage required by
the standard.

What to check

How to check

How often

What action?

Contact
protection
cover for
intactness or
damage

Visual inspection At least every

6 months

Repair or
replacement of
device

Device for
damage to
blades and
housing

Visual inspection At least every

6 months

Replacement of
device

Fastening the
cables

Visual inspection At least every

6 months

Fasten

Insulation of
cables for
damage

Visual inspection At least every

6 months

Replace cables

Impeller for
wear/deposits/
corrosion and
damage

Visual inspection At least every

6 months

Clean or
replace impeller

Tightness of
cable gland

Visual inspection At least every

6 months

Retighten,
replace if
damaged

Condensation
drainage holes
for clogging,
where necessary

Visual inspection At least every

6 months

Open holes

Abnormal
bearing noise

acoustic

At least every
6 months

Replace device

Vibration test

Vibration
measuring
device, start-up
or run-down
measurement

Recommended
every 6 months

Clean, re-
balance and if
necessary
replace impeller

6.4 Disposal

For ebm-papst, environmental protection and resource preservation are
top priority corporate goals.
ebm-papst operates an environmental management system which is
certified in accordance with ISO 14001 and rigorously implemented
around the world on the basis of German standards.
Right from the development stage, ecological design, technical safety
and health protection are fixed criteria.
The following section contains recommendations for ecological disposal
of the product and its components.

6.4.1 Country-specific legal requirements

NOTE
Country-specific legal requirements

Always observe the applicable country-specific legal
regulations with regard to the disposal of products or waste
occurring in the various phases of the life cycle. The
corresponding disposal standards are also to be heeded.

6.4.2 Disassembly

Disassembly of the product must be performed or supervised by
qualified personnel with the appropriate technical knowledge.
The product is to be disassembled into suitable components for disposal
employing standard procedures for motors.

WARNING
Heavy parts of the product may drop off. Some of the
product components are heavy. These components
could drop off during disassembly.

This can result in fatal or serious injury and material damage.
→ Secure components before unfastening to stop them falling.

6.4.3 Component disposal

The products are mostly made of steel, copper, aluminum and plastic.
Metallic materials are generally considered to be fully recyclable.
Separate the components for recycling into the following categories:

Steel and iron

Aluminum

Non-ferrous metal, e.g. motor windings

Plastics, particularly with brominated flame retardants, in accordance
with marking

Insulating materials

Cables and wires

Electronic scrap, e.g. circuit boards

Item no. 50878-5-9970 · ENU · Change 93936 · Approved 2017-05-16 · Page 12 / 13

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание K3G310-AV52-06

Страница 1: ...authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basi...

Страница 2: ...tal contact Before working on the system machine wait until all parts have come to a standstill DANGER Ejected parts Missing protective devices may cause balancing weights or broken fan blades to be e...

Страница 3: ...all protective devices Following the operating instructions Improper use In particular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbal...

Страница 4: ...ertically as illustrated or rotor on bottom rotor on top on request 2 Cable diameter min 4 mm max 10 mm tightening torque 2 5 0 4 Nm 3 Inlet ring with pressure tap k factor 116 4 Tightening torque 3 5...

Страница 5: ...ined at optimum efficiency level The ErP data is determined using a motor impeller combination in a standardized measurement setup 3 4 Technical description Weight 13 4 kg Fan size 310 mm Rotor surfac...

Страница 6: ...neer or operator owner of the device to ensure if necessary after consultation with the network operator that this device is only connected to a connection point with a Ssc value that is greater than...

Страница 7: ...The protective earth terminal is located on the housing and provided with a protective earth symbol and a hole 4 2 2 Supply connection and fuses Assignment of supply cable cross sections and their req...

Страница 8: ...g wires to terminals Seal the terminal box 4 3 3 Cable routing Water must be prevented from reaching the cable gland along the cable NOTE Damage caused by moisture penetration Moisture can penetrate i...

Страница 9: ...level KL3 2 8 GND Reference ground for control interface SELV KL3 3 7 0 10 V Use control current sensor value input 0 10 VDC impedance 100 k only as alternative to 4 20 mA input SELV KL3 4 10 V Voltag...

Страница 10: ...nd possibly resonant frequencies must be determined in the course of fan commissioning Either run through the resonant range as quickly as possible with speed control or find another remedy Operation...

Страница 11: ...ection Isolate from supply correct connection see connection diagram Broken motor winding Replace device Thermal overload protector activated Allow motor to cool off locate and rectify cause of error...

Страница 12: ...replace impeller 6 4 Disposal For ebm papst environmental protection and resource preservation are top priority corporate goals ebm papst operates an environmental management system which is certifie...

Страница 13: ...aterials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolyti...

Отзывы: