background image

Operating instructions

K1G200-AA73-02

Translation of the original operating instructions

4.4 Connection diagram

Drawing preliminary!

Item no. 50764-5-9970 · ENU · Change 205631 · Approved 2019-07-26 · Page 8 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание K1G200-AA73-02

Страница 1: ...nd authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Ba...

Страница 2: ...y that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rotor or the impeller Secure the device against accide...

Страница 3: ...Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the cu...

Страница 4: ...NICAL DATA 3 1 Product drawing All dimensions in mm 1 Cable AWG20 3x crimped splices Item no 50764 5 9970 ENU Change 205631 Approved 2019 07 26 Page 4 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 7...

Страница 5: ...for support Use the device in accordance with its degree of protection Information on surface quality The surfaces of the products conform to the generally applicable industrial standard The surface...

Страница 6: ...fan secure the system machine in which the fan is installed so as to prevent it from being switched back on NOTE Water ingress into wires or cables Water ingress at the customer end of the cable can d...

Страница 7: ...st always be routed downward NOTE Cable routing is to be performed accordingly if use is made of the ESM plug in module to connect the fan Item no 50764 5 9970 ENU Change 205631 Approved 2019 07 26 Pa...

Страница 8: ...ting instructions 4 4 Connection diagram Drawing preliminary Item no 50764 5 9970 ENU Change 205631 Approved 2019 07 26 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen Phone 49...

Страница 9: ...n the event of the faults described in the table Fault Safety feature description function Rotor position detection error An automatic restart follows Blocked rotor After the blockage is removed the m...

Страница 10: ...parts is not permitted Operate the fan for 2 hours at maximum speed so that any water that has ingressed can evaporate If cleaning does not eliminate vibrations the fan may need to be rebalanced To ha...

Страница 11: ...tallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plasti...

Отзывы: