ebm-papst G2E120-CR21-20 Скачать руководство пользователя страница 4

Operating instructions

G2E120-CR21-20

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Cable PFA AWG18, 4x crimped splices

Item no. 16347-5-9970 · ENU · Change 92090 · Approved 2017-05-11 · Page 4 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание G2E120-CR21-20

Страница 1: ...and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the elect...

Страница 2: ...coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating de...

Страница 3: ...ticular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operati...

Страница 4: ...CAL DATA 3 1 Product drawing All dimensions in mm 1 Cable PFA AWG18 4x crimped splices Item no 16347 5 9970 ENU Change 92090 Approved 2017 05 11 Page 4 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D...

Страница 5: ...s EN 60335 1 CE With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions consult ebm papst for s...

Страница 6: ...ed off with an all pole disconnection switch 4 2 1 Requirements Check whether the information on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst che...

Страница 7: ...rst connect the PE protective earth Connect the cables according to your application When doing so observe Chapter 4 4 Connection diagram Item no 16347 5 9970 ENU Change 92090 Approved 2017 05 11 Page...

Страница 8: ...uctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 16347 5 9970 ENU Change 92090 Approved 2017 05 11 Page 8 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen...

Страница 9: ...5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even wit...

Страница 10: ...e occurring in the various phases of the life cycle The corresponding disposal standards are also to be heeded 5 3 2 Disassembly Disassembly of the product must be performed or supervised by qualified...

Отзывы: