Operating instructions

G1G108-AB41-02

Translation of the original operating instructions

4.5 Checking connections

;

Ensure isolation from supply (all phases).

;

Make sure a restart is impossible

;

Check the cables for proper fit.

4.6 Switching on the device

The device may only be switched on if it has been installed properly and
in accordance with its intended use, including the required safety
mechanisms and professional electrical hookup. This also applies for
devices which have already been equipped with plugs and terminals or
similar connectors by the customer.

WARNING
Hot motor housing

Risk of fire
→ Ensure that no combustible or flammable materials are

located close to the blower.

;

Before switching on, check the device for visible external damage
and make sure the protective devices are functional.

;

Check the fan's air flow paths for foreign matter and remove any
foreign matter found.

;

Apply the nominal supply voltage.

;

Start the device by changing the input signal.

NOTE
Damage to the device from vibration

Bearing damage, shorter service life
→ Low-vibration operation of the fan must be ensured over the

entire speed control range.

→ Severe vibration can arise for instance from inexpert

handling, transportation damage and resultant imbalance or
be caused by component or structural resonance.

→ Speed ranges with excessively high vibration levels and

possibly resonant frequencies must be determined in the
course of fan commissioning.

→ Either run through the resonant range as quickly as

possible with speed control or find another remedy.

→ Operation with excessively high vibration levels can

lead to premature failure.

4.7 Switching off the device

Switching off the device during operation:

;

Switch off the device via the control input.

;

Do not switch the motor (e.g. in cyclic operation) on and off via power
supply.

Switching off the device for maintenance:

;

Switch off the device via the control input.

;

Do not switch the motor (e.g. in cyclic operation) on and off via power
supply.

;

Disconnect the device from the power supply.

5. MAINTENANCE, MALFUNCTIONS, POSSIBLE
CAUSES AND REMEDIES

Do not perform any repairs on your device. Send the device to ebm-
papst for repair or replacement.

WARNING
Live terminals and connections even with device
switched off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

CAUTION
If control voltage or a stored speed set value is applied,
the motor will restart automatically, e.g. after a power
failure.

Risk of injury
→ Keep out of the device’s danger zone.
→ When working on the device, switch off the line voltage

and ensure that it cannot be switched back on.

→ Wait until the device comes to a stop.
→ After working on the device, remove any tools or other

objects from the device.

If the device is out of use for some time, e.g. when in storage,
we recommend switching it on for at least two hours to allow
any condensation to evaporate and to move the bearings.

Malfunction/fault

Possible cause

Possible remedy

Impeller not
running smoothly

Imbalance in rotating
parts

Clean the device;
replace it if imbalance
persists after cleaning.
Make sure no
weight clips are
removed during
cleaning.

Motor not turning

Mechanical blockage

Switch off, isolate
from supply and
remove mechanical
blockage.

Line voltage faulty

Check line voltage,
restore power
supply, apply control
signal.

Faulty connection

Isolate from supply,
correct connection;
see connection
diagram.

Motor/electronics
overtemperature

Deficient cooling

Improve cooling. Let
the device cool down.
To reset the error
message, switch off
the line voltage for at
least 25 s and then
switch it on again.

Ambient temperature
too high

Reduce the ambient
temperature.
Reset by reducing
control input to 0.

Impermissible point of
operation

Correct the operating
point. Let the device
cool down.

Item no. 54768-5-9970 · ENU · Change 251863 · Approved 2022-09-07 · Page 8 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание G1G108-AB41-02

Страница 1: ...ked installed operated maintained and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test ru...

Страница 2: ...ntact with the rotor and the impeller Secure the device to prevent contact Before working on the system machine wait until all parts have come to a standstill A sign indicating the hazard due to rotat...

Страница 3: ...hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan...

Страница 4: ...CAL DATA 3 1 Product drawing All dimensions in mm 1 Cable PVC AWG20 4x crimped splices Item no 54768 5 9970 ENU Change 251863 Approved 2022 09 07 Page 4 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D...

Страница 5: ...on Conformity with standards EN 62368 1 Approval EAC With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have spec...

Страница 6: ...and has no disconnecting switch Only connect the device to circuits that can be switched off with an all pole disconnection switch When working on the device secure the system machine in which the de...

Страница 7: ...eference ground 1 2 Tach white Tach output 2 pulses per revolution Isink max 10 mA 1 3 0 10 VDC yellow Control input Re 100k 1 4 Un 24 VDC red Power supply 24 VDC maximum ripple 3 5 Item no 54768 5 99...

Страница 8: ...switch the motor e g in cyclic operation on and off via power supply Disconnect the device from the power supply 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on y...

Страница 9: ...l protection and resource preservation are top priority corporate goals ebm papst operates an environmental management system which is certified in accordance with ISO 14001 and rigorously implemented...

Страница 10: ...ploying the proper procedures for electronic scrap Please contact ebm papst for any other questions on disposal Item no 54768 5 9970 ENU Change 251863 Approved 2022 09 07 Page 10 10 ebm papst Mulfinge...

Отзывы: