ebm-papst D4E225-CC01-30 Скачать руководство пользователя страница 8

Operating instructions

D4E225-CC01-30

Translation of the original operating instructions

4.4 Connection diagram

U1

blue

Z

brown

U2

black

PE

green/yellow

TOP

2x gray

Item no. 11969-5-9970 · ENU · Change 210436 · Approved 2019-12-13 · Page 8 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание D4E225-CC01-30

Страница 1: ...ed and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1...

Страница 2: ...ctromagnetic interference after installing the device in customer equipment Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts co...

Страница 3: ...ing the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer...

Страница 4: ...DATA 3 1 Product drawing All dimensions in mm 1 Cable ETFE AWG20 0 5 mm 6x crimped splices Item no 11969 5 9970 ENU Change 210436 Approved 2019 12 13 Page 4 11 ebm papst Mulfingen GmbH Co KG Bachm hle...

Страница 5: ...t steel galvanized Support structure material Sheet steel galvanized Motor suspension Motor vibration damped on both sides Direction of rotation Counterclockwise viewed toward rotor Degree of protecti...

Страница 6: ...current insulation material capacity etc Route cables so that they cannot be touched by any rotating parts DANGER Electrical charge 50 C between phase conductor and protective earth connection after...

Страница 7: ...he motor against high voltage transients that can destroy the coil insulation system and against harmful bearing currents Heating up of the motor when using a variable frequency drive must be checked...

Страница 8: ...4 4 Connection diagram U1 blue Z brown U2 black PE green yellow TOP 2x gray Item no 11969 5 9970 ENU Change 210436 Approved 2019 12 13 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mul...

Страница 9: ...device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with device switched off Electric shock Wait five minutes after disconnecting the voltage at...

Страница 10: ...least every 6 months Fasten Fastening the protective earth terminal Visual inspection At least every 6 months Fasten Insulation of cables for damage Visual inspection At least every 6 months Replace c...

Страница 11: ...aterials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolyti...

Отзывы: