background image

Operating instructions

A8D630-AN01-02

Translation of the original operating instructions

Fig. 3: Cable routing for fans installed upright.

4.3.4 Motor protection

CAUTION
Voltage

The device is a built-in component and has no disconnecting
switch.
→ Connect the device to a suitable tripping unit.
→ Only connect the device to circuits that can be switched

off with an all-pole disconnection switch.

→ When working on the device, secure the system/

machine in which the device is installed so as to prevent it
from being switched back on.

NOTE
Lack of motor protection

Without motor protection, the motor can overheat and suffer
damage.
→ Connect the thermal overload protector installed in the

winding.

The motors are equipped with thermal overload protectors to protect the
devices.
Check to make sure that the thermal overload protector is correctly
connected before each operation.
Failure to connect the thermal overload protector correctly will
invalidate your warranty claim.

Item no. 13075-5-9970 · ENU · Change 202824 · Approved 2019-04-15 · Page 8 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание A8D630-AN01-02

Страница 1: ...itably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 B...

Страница 2: ...act with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair an...

Страница 3: ...g the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe v...

Страница 4: ...ion of air flow A 2 Max clearance for screw 12 mm 3 Tightening torque 1 5 0 2 Nm 4 Cable diameter min 6 mm max 12 mm tightening torque 2 0 3 Nm Item no 13075 5 9970 ENU Change 202824 Approved 2019 04...

Страница 5: ...be made of a fan design with special low temperature bearings Installation position Shaft horizontal or rotor on bottom rotor on top on request Condensation drainage holes On rotor side Mode S1 Motor...

Страница 6: ...c shock Always connect a protective earth first Check the protective earth DANGER Faulty insulation Risk of fatal injury from electric shock Use only cables that meet the specified installation regula...

Страница 7: ...on Only strip the cable as far as necessary ensuring that the cable gland is sealed and there is no strain on the connections For tightening torques see Chapter 3 1 Product drawing NOTE Tightness and...

Страница 8: ...revent it from being switched back on NOTE Lack of motor protection Without motor protection the motor can overheat and suffer damage Connect the thermal overload protector installed in the winding Th...

Страница 9: ...tion Y Star connection L1 U1 black L2 V1 blue L3 W1 brown W2 yellow U2 green V2 white TOP 2x gray PE green yellow Item no 13075 5 9970 ENU Change 202824 Approved 2019 04 15 Page 9 12 ebm papst Mulfing...

Страница 10: ...inexpert handling transportation damage and resultant imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonant frequencies...

Страница 11: ...e it Repair of load bearing or rotating parts is not permitted Operate the fan for 2 hours at maximum speed to permit the evaporation of any moisture that may have ingressed If cleaning does not elimi...

Страница 12: ...tallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plasti...

Отзывы: