background image

Operating instructions

A8D630-AK01-01

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Direction of air flow "V"

2

Max. clearance for screw 12 mm

3

Tightening torque 1.5 ± 0.2 Nm

4

Cable diameter min. 6 mm, max. 12 mm, tightening torque 2 ± 0.3 Nm

Item no. 10115-5-9970 · ENU · Change 202824 · Approved 2019-04-12 · Page 4 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание A8D630-AK01-01

Страница 1: ...itably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 B...

Страница 2: ...act with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair an...

Страница 3: ...ollowing ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also in...

Страница 4: ...ion of air flow V 2 Max clearance for screw 12 mm 3 Tightening torque 1 5 0 2 Nm 4 Cable diameter min 6 mm max 12 mm tightening torque 2 0 3 Nm Item no 10115 5 9970 ENU Change 202824 Approved 2019 04...

Страница 5: ...ookup Terminal box Motor protection Thermal overload protector TOP with basic insulation with cable Axial Protection class I with customer connection of protective earth Conformity with standards EN 6...

Страница 6: ...witching off supply with multiple devices connected in parallel Electric shock risk of injury Ensure sufficient protection against accidental contact Before working on the electrical hookup short the...

Страница 7: ...nect the thermal overload protector TOP Use a screwdriver to do so When connecting ensure that no wire ends fan out The terminal strip is equipped with a penetration guard Insert the leads until they...

Страница 8: ...pped with thermal overload protectors to protect the devices Check to make sure that the thermal overload protector is correctly connected before each operation Failure to connect the thermal overload...

Страница 9: ...tion Y Star connection L1 V1 blue L2 U1 black L3 W1 brown W2 yellow U2 green V2 white TOP 2x gray PE green yellow Item no 10115 5 9970 ENU Change 202824 Approved 2019 04 12 Page 9 12 ebm papst Mulfing...

Страница 10: ...inexpert handling transportation damage and resultant imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonant frequencies...

Страница 11: ...e it Repair of load bearing or rotating parts is not permitted Operate the fan for 2 hours at maximum speed to permit the evaporation of any moisture that may have ingressed If cleaning does not elimi...

Страница 12: ...tallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plasti...

Отзывы: