ebm-papst A4D710-AL01-02 Скачать руководство пользователя страница 8

Operating instructions

A4D710-AL01-02

Translation of the original operating instructions

4.4 Connection screen

Δ

Delta connection

Y

Star connection

L1

= V1 = blue

L2

= U1 = black

L3

= W1 = brown

W2

yellow

U2

green

V2

white

TOP

2 x grey

PE

green/yellow

Item no. 10036-5-9970 · Revision 75725 · Release 2012-02-28 · Page 8 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание A4D710-AL01-02

Страница 1: ...rised specialist personnel are permitted to transport unpack assemble operate or maintain the device or to use it in any other manner 1 3 Basic safety rules 1 1 3 Basic safety rules Any safety hazards...

Страница 2: ...oose items of clothing and jewellery could become entangled and pulled into the device You could be injured Do not wear any loose clothing or jewellery while working on rotating parts Protect long hai...

Страница 3: ...imbalance e g caused by dirt deposits or icing Operation in medical equipment with a life sustaining or lifesaving function Operation with external vibrations Moving solids content in flow medium Pai...

Страница 4: ...1 Direction of air flow A 2 Screw depth max 18 mm 3 Tightening torque 1 5 Nm 0 2 Nm 4 Cable diameter min 7 mm max 14 mm tightening torque 2 Nm 0 3 Nm Item no 10036 5 9970 Revision 75725 Release 2012 0...

Страница 5: ...A Direction of rotation Counter clockwise seen on rotor Type of protection IP 54 Insulation class F Humidity class F3 1 Mounting position Any Condensate discharge holes On rotor and stator sides Opera...

Страница 6: ...n the customers side and can damage the device Make sure that the cable end is connected in a dry environment Connect the device only to circuits that can be switched off using an all pole disconnecti...

Страница 7: ...nstalled lying flat cable routed as a water trap Fans installed in upright position When routing the cable ensure that the screwed cable glands are arranged at the bottom The cables must always be rou...

Страница 8: ...ction Y Star connection L1 V1 blue L2 U1 black L3 W1 brown W2 yellow U2 green V2 white TOP 2 x grey PE green yellow Item no 10036 5 9970 Revision 75725 Release 2012 02 28 Page 8 10 ebm papst Mulfingen...

Страница 9: ...repairs may be carried out by ebm papst only The terminal box does not have to be opened for maintenance Do not perform any repairs on your device Return the device to ebm papst for repair or replacem...

Страница 10: ...pection At least every 6 months Replacement of the device Mounting the connection lines Visual inspection At least every 6 months Fasten Mounting of protective earth connection Visual inspection At le...

Отзывы: