Page 11
background image

Operating instructions

A3G710-AO81-03

Translation of the original operating instructions

Line voltage faulty

Check line voltage,
restore power supply.
Attention! The error
message resets
automatically.
Device restarts
automatically without
warning.

Faulty connection

Isolate from supply,
correct connection;
see connection
diagram.

Broken motor winding Replace device
Thermal overload
protector activated

Allow motor to cool
off, locate and rectify
cause of error,
release restart lockout
if necessary

Deficient cooling

Improve cooling. Let
the device cool down.
To reset the error
message, switch off
the line voltage for at
least 25 s and then
switch it on again.
Alternatively, reset
the error message by
applying a control
signal of < 0.5 V to
Din1 or by shorting
Din1 to GND.

Ambient temperature
too high

Reduce the ambient
temperature. Let the
device cool down.
To reset the error
message, switch off
the line voltage for at
least 25 s and then
switch it on again.
Alternatively, reset
the error message by
applying a control
signal of < 0.5 V to
Din1 or by shorting
Din1 to GND.

Impermissible point of
operation (e.g. back
pressure too high)

Correct the operating
point. Let the device
cool down.
To reset the error
message, switch off
the line voltage for at
least 25 s and then
switch it on again.
Alternatively, reset
the error message by
applying a control
signal of < 0.5 V to
Din1 or by shorting
Din1 to GND.

In the event of further malfunctions, contact ebm-papst.

6.1 Cleaning

NOTE
Damage to the device during cleaning

Malfunction possible
→ Do not clean the device using a water jet or high-pressure

cleaner.# Do not use any acid, alkali or solvent-
basedcleaning agents.# Do not use any pointed or sharp-
edged objects for cleaning

6.2 Safety inspection

NOTE
High-voltage test

The integrated EMC filter has Y capacitors. The tripping current
is exceeded when AC testing voltage is applied.
→ Test the device with DC voltage when you perform the

legally required high-voltage test. The voltage to be used
corresponds to the peak value of the AC voltage required by
the standard.

What to check

How to check

How often

What action?

Contact
protection
cover for
intactness or
damage

Visual inspection At least every

6 months

Repair or
replacement of
device

Device for
damage to
blades and
housing

Visual inspection At least every

6 months

Replacement of
device

Fastening the
cables

Visual inspection At least every

6 months

Fasten

Fastening the
protective earth
terminal

Visual inspection At least every

6 months

Fasten

Insulation of
cables for
damage

Visual inspection At least every

6 months

Replace cables

Tightness of
cable gland

Visual inspection At least every

6 months

Retighten,
replace if
damaged

Condensation
drainage holes
for clogging,
where necessary

Visual inspection At least every

6 months

Open holes

Welds for crack
formation

Visual inspection At least every

6 months

Replace device

6.3 Disposal

For ebm-papst, environmental protection and resource preservation are
top priority corporate goals.
ebm-papst operates an environmental management system which is
certified in accordance with ISO 14001 and rigorously implemented
around the world on the basis of German standards.
Right from the development stage, ecological design, technical safety
and health protection are fixed criteria.

Item no. 50442-5-9970 · ENU · Change 89187 · Approved 2016-04-14 · Page 11 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание A3G710-AO81-03

Страница 1: ...ed and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1...

Страница 2: ...ntal contact Before working on the system machine wait until all parts have come to a standstill DANGER Ejected parts Missing protective devices may cause balancing weights or broken fan blades to be...

Страница 3: ...ng the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Operation in medical equipment with a lif...

Страница 4: ...rance for screw 16 mm 3 Cable diameter min 4 mm max 10 mm tightening torque 2 0 3 Nm 4 Tightening torque 3 5 0 5 Nm Item no 50442 5 9970 ENU Change 89187 Approved 2016 04 14 Page 4 12 ebm papst Mulfin...

Страница 5: ...dardized measurement setup 3 4 Technical description Weight 12 3 kg Fan size 710 mm Rotor surface Painted black Electronics housing material Die cast aluminum painted black Blade material Sheet alumin...

Страница 6: ...ar safety shoes and cut resistant safety gloves CAUTION Heavy load when unpacking device Risk of physical injury such as back injuries Two people should work together to remove the device from its pac...

Страница 7: ...t breaker Cable cross section Cable cross section VDE UL VDE mm AWG 3 PE AC 380 480 VAC 16 A 15 A C16A 1 5 2 5 16 AWG American Wire Gauge 4 2 3 Reactive currents Because of the EMC filter integrated f...

Страница 8: ...wdriver to do so When connecting ensure that no wire ends fan out Fig 2 Connecting wires to terminals Seal the terminal box 4 3 3 Cable routing Water must be prevented from reaching the cable gland al...

Страница 9: ...round for control interface SELV KL3 3 7 0 10 V Use control current sensor value input 0 10 VDC impedance 100 k only as alternative to 4 20 mA input SELV KL3 4 10 V Voltage output 10 VDC 3 max 10 mA p...

Страница 10: ...the motor to switch off automatically in the event of the faults described in the table The status relay drops out and the fault is reported via bus Fault Safety feature description function Rotor po...

Страница 11: ...ted or sharp edged objects for cleaning 6 2 Safety inspection NOTE High voltage test The integrated EMC filter has Y capacitors The tripping current is exceeded when AC testing voltage is applied Test...

Страница 12: ...aluminum and plastic Metallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e...

Отзывы: