ebm-papst A2S130-AA25-01 Скачать руководство пользователя страница 4

Operating instructions

A2S130-AA25-01

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Direction of air flow "V"

2

Max. clearance for screw 5 mm

3

Cable PVC AWG20
2x splice

Item no. 14485-5-9970 · ENU · Change 220349 · Approved 2021-10-25 · Page 4 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание A2S130-AA25-01

Страница 1: ...ted maintained and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform wo...

Страница 2: ...ndstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the device Injuries can result Do not wear any loose fitting or da...

Страница 3: ...ing the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer...

Страница 4: ...wing All dimensions in mm 1 Direction of air flow V 2 Max clearance for screw 5 mm 3 Cable PVC AWG20 2x splice Item no 14485 5 9970 ENU Change 220349 Approved 2021 10 25 Page 4 10 ebm papst Mulfingen...

Страница 5: ...ion Conformity with standards EN 60034 1 EN 60204 1 EN 60335 1 CE Approval CSA C22 2 No 113 UL 507 EAC VDE With regard to cyclic speed loads note that the rotating parts of the device are designed for...

Страница 6: ...switched off with an all pole disconnection switch 4 2 1 Requirements Check whether the information on the nameplate matches the connection data Before connecting the device make sure the power supply...

Страница 7: ...ons 4 3 Connection diagram L black N black TOP thermal overload protector Item no 14485 5 9970 ENU Change 220349 Approved 2021 10 25 Page 7 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfin...

Страница 8: ...ure to disconnect the ground connection last 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WA...

Страница 9: ...e Abnormal bearing noise acoustic At least every 6 months Replace device 5 3 Disposal For ebm papst environmental protection and resource preservation are top priority corporate goals ebm papst operat...

Страница 10: ...omponents employing the proper procedures for electronic scrap Please contact ebm papst for any other questions on disposal Item no 14485 5 9970 ENU Change 220349 Approved 2021 10 25 Page 10 10 ebm pa...

Отзывы: