ebm-papst A2E250-AE65-10 Скачать руководство пользователя страница 4

Operating instructions

A2E250-AE65-10

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Direction of air flow "A"

2

Max. clearance for screw 5 mm

3

Cable PVC 4G 0.5 mm², 4x crimped splices

Item no. 13817-5-9970 · ENU · Change 210726 · Approved 2020-10-23 · Page 4 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание A2E250-AE65-10

Страница 1: ...and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the elect...

Страница 2: ...efore working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pul...

Страница 3: ...ing the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer...

Страница 4: ...l dimensions in mm 1 Direction of air flow A 2 Max clearance for screw 5 mm 3 Cable PVC 4G 0 5 mm 4x crimped splices Item no 13817 5 9970 ENU Change 210726 Approved 2020 10 23 Page 4 11 ebm papst Mulf...

Страница 5: ...have factory installed overheating protection With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special que...

Страница 6: ...ether the information on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether the information on the motor run capacitor matches the inform...

Страница 7: ...ted in a U shaped loop wherever possible If this is not possible a drip edge can be produced by fitting a cable tie directly in front of the cable gland for example Fans installed upright Fig 1 Cable...

Страница 8: ...ith motor run capacitor 1 Clockwise operation 2 Counterclockwise operation U1 black U2 gray Z1 blue Z2 brown PE green yellow Item no 13817 5 9970 ENU Change 210726 Approved 2020 10 23 Page 8 11 ebm pa...

Страница 9: ...h 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even w...

Страница 10: ...on At least every 6 months Open holes Welds for crack formation Visual inspection At least every 6 months Replace device Abnormal bearing noise acoustic At least every 6 months Replace device 5 3 Disp...

Страница 11: ...r internal wiring Electrolytic capacitors Dispose of electronic components employing the proper procedures for electronic scrap Please contact ebm papst for any other questions on disposal Item no 138...

Отзывы: