ebm-papst A2D200-AA04-29 Скачать руководство пользователя страница 5

Operating instructions

A2D200-AA04-29

Translation of the original operating instructions

All dimensions in mm.

Accessory parts, included separately:

1

Terminal box cover

2

Grommet

3

Seal

4

Base of terminal box

5

Oval-head screw

6

Toothed lock washer

7

Cable gland, cable diameter min. 8 mm, max. 10 mm, tightening torque 1.3 ± 0.2 Nm

8

Stopper

9

Screw plugs (2x), tightening torque 1.3 ± 0.2 Nm

10

2x oval-head screws, tightening torque 1.3 ± 0.2 Nm

Item no. 15551-5-9970 · ENU · Change 256796 · Approved 2022-05-11 · Page 5 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание A2D200-AA04-29

Страница 1: ...therwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical...

Страница 2: ...e Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the device Injuries can result Do not wear any loose fitting or dangling clothing or jewelry whi...

Страница 3: ...prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration...

Страница 4: ...ons in mm 1 Direction of air flow A 2 Max clearance for screw 5 mm 3 Cable PVC 7G 0 5 mm 6x splice 1x ring terminal dia 4 3 PE Item no 15551 5 9970 ENU Change 256796 Approved 2022 05 11 Page 4 12 ebm...

Страница 5: ...rew 6 Toothed lock washer 7 Cable gland cable diameter min 8 mm max 10 mm tightening torque 1 3 0 2 Nm 8 Stopper 9 Screw plugs 2x tightening torque 1 3 0 2 Nm 10 2x oval head screws tightening torque...

Страница 6: ...ctory installed overheating protection CE Use the device in accordance with its degree of protection Information on surface quality The surfaces of the products conform to the generally applicable ind...

Страница 7: ...environment Only connect the device to circuits that can be switched off with an all pole disconnection switch 4 2 1 Requirements Check whether the information on the nameplate matches the connection...

Страница 8: ...netrate into the terminal box if water is constantly present at the cable glands To prevent the constant accumulation of water at the cable glands the cable should be routed in a U shaped loop whereve...

Страница 9: ...two phases Three phase motor Delta connection Y Star connection L1 U1 black L2 V1 blue L3 W1 brown U2 green V2 white W2 yellow PE green yellow Item no 15551 5 9970 ENU Change 256796 Approved 2022 05 1...

Страница 10: ...device from the power supply at the supply line s main switch When disconnecting be sure to disconnect the ground connection last 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perfor...

Страница 11: ...ion At least every 6 months Replace device Abnormal bearing noise acoustic At least every 6 months Replace device 5 3 Disposal For ebm papst environmental protection and resource preservation are top...

Страница 12: ...ectrolytic capacitors Dispose of electronic components employing the proper procedures for electronic scrap Please contact ebm papst for any other questions on disposal Item no 15551 5 9970 ENU Change...

Отзывы: