background image

Operating instructions

K3G500-PB24-03

Translation of the original operating instructions

4.3 Connection in terminal box

4.3.1 Preparing cables for connection

Only strip the cable as far as necessary, ensuring that the cable gland is
sealed and there is no strain on the connections. For tightening torques,
see Chapter 3.1 Product drawing.

NOTE
Tightness and strain relief are dependent on the cable
used.

→ This must be checked by the user.

4.3.2 Connecting wires to terminals

WARNING
Live terminals and connections even with device
switched off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

;

Remove the cap from the cable gland.

Only remove caps where cables are fed in.

;

Equip the cable glands with the seals provided in the terminal box.

;

Route the wire(s) (not included in scope of delivery) into the terminal
box.

;

First connect the "PE" (protective earth).

;

Connect the wires to the corresponding terminals.

Use a screwdriver to do so.
When connecting, ensure that no wire ends fan out.

;

Seal the terminal box.

4.3.3 Cable routing

Water must be prevented from reaching the cable gland along the cable.

NOTE
Damage caused by moisture penetration.

Moisture can penetrate into the terminal box if water is
constantly present at the cable glands.
→ To prevent the constant accumulation of water at the cable

glands, the cable should be routed in a U-shaped loop
wherever possible.

→ If this is not possible, a drip edge can be produced by

fitting a cable tie directly in front of the cable gland for example.

4.4 Factory settings

Factory settings made for the device by ebm-papst.

Mode parameter set 1

PWM control

Mode parameter set 2

PWM control

Fan/device address

01

Max. PWM / %

100

Min. PWM / %

5

Save set value to
EEPROM

Yes

Set value requirement

Analog (linear)

Direction of action
parameter set 1

Positive (heating)

Direction of action
parameter set 2

Positive (heating)

Item no. 55783-5-9970 · ENU · Change 99204 · Approved 2018-08-01 · Page 8 / 14

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание K3G500-PB24-03

Страница 1: ...evice to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again fo...

Страница 2: ...rical or electromagnetic interference after installing the device in customer equipment Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to b...

Страница 3: ...n stationary systems Performing all maintenance work Conveying air at an ambient air pressure between 800 mbar and 1050 mbar Using the device within the permitted ambient temperature range see Chapter...

Страница 4: ...ustrated or rotor on bottom rotor on top on request 2 Cable diameter min 4 mm max 10 mm tightening torque 2 0 3 Nm 3 Tightening torque 1 5 0 2 Nm 4 Inlet ring with pressure tap k factor 281 5 Mounting...

Страница 5: ...ion in a standardized measurement setup 3 4 Technical description Weight 43 3 kg Size 500 mm Motor size 150 Rotor surface Painted black Electronics housing material Die cast aluminum Impeller material...

Страница 6: ...he network operator that this device is only connected to a connection point with a Ssc value that is greater than or equal to 120 times the rated output of the arrangement 4 CONNECTION AND STARTUP 4...

Страница 7: ...necessary to connect an additional protective earth conductor by way of the extra protective earth terminal provided on the device The protective earth terminal is located on the housing and provided...

Страница 8: ...s Use a screwdriver to do so When connecting ensure that no wire ends fan out Seal the terminal box 4 3 3 Cable routing Water must be prevented from reaching the cable gland along the cable NOTE Damag...

Страница 9: ...tting set value characteristic curve parameterizable SELV CON2 IO3 OUT1 Analog output 0 10 V 0 10 V max 5 mA function parameterizable factory setting modulation level max output frequency 300 Hz SELV...

Страница 10: ...nput Ri 100K characteristic curve parameterizable fPWM 1k 10KHz SELV D159 2 Ain2 4 20mA analog input Ri 125R characteristic curve parameterizable SELV D159 3 Din3 active high digital input not active...

Страница 11: ...nce from inexpert handling transportation damage and resultant imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonant fre...

Страница 12: ...wn Ambient temperature too high Reduce the ambient temperature Allow the device to cool down Impermissible operating point e g back pressure too high Correct the operating point Allow the device to co...

Страница 13: ...of cables for damage Visual inspection At least every 6 months Replace cables Impeller for wear deposits corrosion and damage Visual inspection At least every 6 months Clean impeller or replace devic...

Страница 14: ...lating materials Cables and wires Electronic scrap e g circuit boards Only ferrite magnets and not rare earth magnets are used in external rotor motors from ebm papst Mulfingen GmbH Co KG Ferrite magn...

Отзывы: