c/c-space 25
–
46 cm
Cold cable Splice (is to be fully grouted)
Endseal
Plug
Planning & Installing
Layout
1. Keep heating coil in heated area. The installation will then be easier.
2. Roll out the cable on the bottom reinforcement.
3. Lash loosely. Use tape or plastic-coated lash thread. Machine can be used with loose settings.
4. The cables must not be crossed. Minimum spacing between cables 15 cm.
5. Warning! The cable is not to be in contact with non-conducting composition as cellular plastic, mineral
wool, or similar.
6. The whole heating cable length is to be moulded in, including the cold cable splice.
7. The cable is to be taken in use immediately after moulding. (Before moulding, you must only connect
the cable for short time tests).
Installation instructions BHS
Heating cable for hardening/frost protection of concrete
EN
Calculating the area and cable spacing when curing concrete
Plan the surface on the basis of your required output/m2. Try to keep the connection ends close
to each other. If the central BHS unit is used, the spiral hose (item no. 8960541) has to be attached
between two heat cables and in the centre of the cast concrete. It is used for the sensor cable.
Cable length
85 m
55 m
35 m
20 m
10 m
Effect (W/m2)
Area m2 c/c
Area m2 c/c
Area m2 c/c
Area m2 c/c
Area m2 c/c
150
23
27
15
27
9
27
5
25
2,5
25
120
29
34
19
34
12
34
6
30
3,2
32
100
35
41
22
40
14
40
7
35
3,8
38
90
39
46
25
46
16
46
8
40
4,2
42