P.77
6.2.1 LOCAL (Pump Side) Start/Stop
a) START
Press the START button on the controller.
The Main Pump (MP) will start and the MP RUN lamp on the controller will light.
After this, the Booster Pump (BP) will start automatically and the B.P. RUN lamp on
the controller will light.
The current is indicated on the display during pump operation.
For other status display indications, refer to Table 6.1.
[ NOTE ]
The pump will not start when an WARNING/ALARM has been
generated. When the START button is pressed, "STARTFAIL" will
appear on the display.
b) STOP
Press the STOP button on the controller. The MP and BP will stop
simultaneously.
The RUN lamp goes out and the display gives a power reading of 0.0kW.
6.2.2 REMOTE Start/Stop
a) START
Enter the external "MP" start signal input from the control connector. The MP will
start.
In the case of DIP SW A-8
⇒
OFF :
“MP” rotation reaches 3000 min-1, “BP”
will start automatically.
In the case of DIP SW A-8
⇒
ON
:
“MP” rotation reaches 3000 min-1, input
the external “BP” start signal. BP will start.
The power is indicated on the display during pump operation. For other
status display indications, refer to Table 6.1.
[ NOTE ]
The pump will not start when a WARNING/ALARM has been
generated. When a START signal is entered, "STARTFAIL" will
appear on the display.
b) STOP
Interrupt the external MP start signal and the pump will stop.
PM10U
EBARA
CORPORATION
Содержание EV-S100
Страница 10: ...viii LOCATION WARNING LABEL1 PM10U EBARA CORPORATION...
Страница 11: ...ix LOCATION WARNING LABEL2 PM10U EBARA CORPORATION...
Страница 16: ...xiv PM10U EBARA CORPORATION...
Страница 33: ...P 14 3 5 3 Outline Drawing MODEL EV S20 OUTLINE DRAWING PM10U EBARA CORPORATION...
Страница 34: ...P 15 MODEL EV S20P EV S 20N OUTLINE DRAWING PM10U EBARA CORPORATION...
Страница 35: ...P 16 MODEL EV S50 OUTLINE DRAWING PM10U EBARA CORPORATION...
Страница 36: ...P 17 MODEL EV S50P EV S50N OUTLINE DRAWING PM10U EBARA CORPORATION...
Страница 37: ...P 18 MODEL EV S100 OUTLINE DRAWING PM10U EBARA CORPORATION...
Страница 38: ...P 19 MODEL EV S100P EV S 100N OUTLINE DRAWING PM10U EBARA CORPORATION...
Страница 39: ...P 20 MODEL EV S200 OUTLINE DRAWING PM10U EBARA CORPORATION...
Страница 40: ...P 21 MODEL EV S200P EV S 200N OUTLINE DRAWING PM10U EBARA CORPORATION...
Страница 41: ...P 22 MODEL EV S20 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Страница 42: ...P 23 MODEL EV S20P EV S 20N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Страница 43: ...P 24 MODEL EV S50 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Страница 44: ...P 25 MODEL EV S50P EV S50N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Страница 45: ...P 26 MODEL EV S100 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Страница 46: ...P 27 MODEL EV S100P EV S 100N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Страница 47: ...P 28 MODEL EV S200 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Страница 48: ...P 29 MODEL EV S200P EV S 200N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Страница 56: ...P 37 EV S20 LOCATION FIXTURE PM10U EBARA CORPORATION...
Страница 57: ...P 38 EV S50 LOCATION FIXTURE PM10U EBARA CORPORATION...
Страница 58: ...P 39 EV S100 LOCATION FIXTURE PM10U EBARA CORPORATION...
Страница 59: ...P 40 EV S200 LOCATION FIXTURE PM10U EBARA CORPORATION...