
9 . 4
I n s p e c t i o n a n d M a i n t e n a n c e
Refer to Section 11 in the EAW Loudspeaker Owner’s Manual (included) for complete information on
inspecting and maintaining EAW loudspeakers and rigging systems.
Before suspending in an array, the rigging right and left panel assembly of each loudspeaker should be
inspected to ensure that all lock washers in the assemblies are fully collapsed and that all fasteners are secure.
If any are found loose, they should be tightened to the appropriate torque setting as shown in Table 1.
Note:
Four (4) screws on each end in position “C” also require Loctite® 222.
The four (4) quick-release pins in each loudspeaker must be inspected before adding the loudspeaker to
an array. All of these pins must work freely and properly to ensure that they engage correctly in the
rigging process.
Page
22
Inspection points circled
(3) Places at each latch
Содержание N T L 7 2 0
Страница 1: ...N T L 7 2 0 L O U D S P E A K E R O W N E R S M A N U A L...
Страница 2: ...ii...
Страница 34: ...Page 28...
Страница 35: ...Page 29...