Eaton xStorage 400 Installation and Operation Manual P-164001032—Rev 01
31
44..66
IInnssttaalllliinngg IInntteerrffaaccee W
Wiirriinngg C
Coonnnneeccttiioonnss
Interface connections on the xStorage 400 are primarily related to the Control and Monitoring Panel wiring.
Internal connections will be factory wired. Cable routing to the Control and Monitoring panel are through
conduits to the CMP mounted on an H-Frame located adjacent to the xStorage 400. See
for an
example of the CMP installed to the right of the xStorage 400.
The Control and Monitoring Panel must be mounted on the H-Frame at a minimum height of 36 inches (91.44
cm) above ground level.
Figure 19. Control and Monitoring Panel Installation Location — Example
H-Frame
Control and Monitoring
Panel
Conduit
CMP is mounted on the
H-Frame at a minimum height
of 36 inches (91.44 cm)
above ground level.
Содержание xStorage 400
Страница 6: ...vi Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Table of Contents...
Страница 8: ...viii Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 List of Figures...
Страница 10: ...x Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 List of Tables...
Страница 32: ...22 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Inspecting and Unpacking...
Страница 56: ...46 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Hydrogen Mitigation Procedure...
Страница 66: ...56 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Predict Pulse Dashboard...
Страница 86: ...76 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Warranty...
Страница 95: ...Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 85 Battery Safety Data Sheets...
Страница 96: ...P 16400103201 P 164001032 01...