background image

I.L. 3778A20B

Page 4

Effective 11/97

1-4   OPERATION

1-4.1   SAFE PRACTICES

A GROUND AND TEST DEVICE IS A SAFETY-
RELATED DEVICE.   IT MUST BE RECOGNIZED
THAT IMPROPER USE CAN RESULT IN DEATH,
SERIOUS PERSONAL INJURY, OR PROPERTY
DAMAGE.  THAT IS WHY IT IS MOST IMPORTANT
THAT THE USER DEVELOP SPECIFIC AND SAFE
OPERATING PROCEDURES FOR ITS USE. 

The following general safe practices are recommended: 

The device cannot be stored in a VAC CLAD-
W Breaker compartment.  It can only be
stored in a storage compartment.

•     Store the device in a clean,  dry area free from

dust, dirt, moisture, etc. 

•     Keep all insulating surfaces, which include pri-

mary support insulation and insulation barriers,
clean and dry. 

Check  all  primary  circuit  connections  to
make certain that they are clean and tight. 

Permit only authorized trained personnel to use
this device. 

Take extreme care while using this device to
avoid contacting “Live” or “Hot” (energized) ter-
minals.

Do not remove the device front panel while
using this device. 

Always close the grounding switch electrically
from the  farthest distance with the remote  con-
trol switch. 

Before  inserting  the  device into the compart-
ment,

correctly identify line and bus termi-

nals for the breaker compartment

and visual-

ly make certain that the selector switch is con-
nected to the desired terminals.  Also make cer-
tain that the connected terminals are Bus or
Line as desired. 

Typical procedures for use of this device are as follows:

1-4.2   GROUNDING

1.

With the device out of the breaker compartment,
insert the selector switch operating handle and
set the switch for upper or lower terminals as
desired.  Remove the handle. 

DO NOT ATTEMPT TO OPERATE THE SELECTOR
SWITCH WHEN IT IS ON THE EXTENSION RAILS.
FAILURE TO COMPLY COULD RESULT IN THE
DEVICE COMING OFF THE RAILS CAUSING BODILY
INJURY AND/OR EQUIPMENT DAMAGE. 

2.    Lift the device and load it on to the extension

rails of the breaker compartment with extreme
care.

3.    Push  the  device  to  the  Test  position  as indi-

cated by the crisp clicking sound of the levering
latch engaging the levering nut. 

4.    Using the breaker levering crank, lever the

device to the “Connected” position as indicated
by the red flag appearing in front of and under
the levering crank. 

5.    Unlock and open the lower test ports

(Selectable Terminals)  and  test  for  “dead”
circuit  using correctly rated neon test stick or
equivalent.

6.    After the circuit  is  checked  “dead”  and made

certain that it is maintained “dead”, connect the
remote  control  switch  cable  and  close  the
grounding switch from the safest distance. 

7.    Padlock the ground switch closed by discon-

necting the control switch cable and sliding the
cover to the left. It may also be locked by an
optional key lock K3,if provided (Figure 

3

).

1-4.3  CABLE TESTING

1.    With the device out of the breaker compartment,

insert the selector switch operating handle and
set the switch for upper or lower terminals as
desired.  Remove the handle. 

!

CAUTION

!

WARNING

Содержание VCP-W

Страница 1: ...ertion into a Vac Clad W switchgear compartment to provide a safe and convenient means to Figure 1 1 Ground the circuit for maintenance work 2 Apply potential for cable testing 3 Provide access to bot...

Страница 2: ...ning The grounding switch can be opened by manual operation of the Push to Open button located behind the sliding cover on the device front panel Figure 3 If electrical trip is provided at the control...

Страница 3: ...lector switch operating handle can be removed only when the blades are fully engaged with either the upper or lower termi nals Figure 5 The selector switch operating handle cannot be inserted when the...

Страница 4: ...us or Line as desired Typical procedures for use of this device are as follows 1 4 2 GROUNDING 1 With the device out of the breaker compartment insert the selector switch operating handle and set the...

Страница 5: ...tage to the cables via the insulated test probes 1 4 4 PHASING OUT 1 With the device out of the switchgear enclosure engage the selector switch operating handle and set the selector switch to the lowe...

Страница 6: ...63 12 00 9 8 7 KT2 Upper terminal test ports key interlock Selectable terminal test ports padlock Grounding switch operation key interlock Lever latch handle Grounding switch blade KT1 Key interlock...

Страница 7: ...erlock Selector switch position indicator Selectable terminal port Selectable terminal test ports padlock Operations counter Grounding switch position indicator Grounding switch operation interlock Gr...

Страница 8: ...witch locked with lower terminals With key removed grounding switch cannot be closed KT1 Key interlock Key interlock bolt shown locking selector switch in lower position Selector switch interlock plat...

Страница 9: ...3 4 Selector switch operating handle engaged switch connected with lower terminals Spring loaded latch pin Pull to engage selector switch handle Release after removing handle Spring loaded latch pin...

Страница 10: ...ntrol Switch Vertical No Circuit Spring Return Position CW Close CCW Trip Y Anti Pump Relay M Charging Motor LS Limit Switch Shown Spring Discharged ST Shunt Trip Coil TD Time Delay Relay Seals in to...

Страница 11: ...has 3 Hole Female Socket KT PS WHITE CLOSE W 1 Y X R 24 M SR Y LS1 b LS2 Y CS Control Switch CCW __Charge Close Vertical No Circuit Spring Return Position Y Seal in Relay M Charging Motor LS Limit Swi...

Страница 12: ...Cutler Hammer Five Parkway Center Pittsburgh PA 15220 Effective 11 97 ISI Style 3778A20B Printed in U S A I L 3778A20B Page 12...

Отзывы: