11
System Parallel Module
For the following steps, use pincer type pliers or a large flat blade screw driver to
straighten the securing tabs.
NOTE
For the following step, verify that the forklift or pallet jack is rated to handle the
weight of the cabinets (see Table 3-1 for cabinet weight).
NOTE
1. Carefully inspect the outer packaging for evidence of damage during transit.
CAUTION
Do not install a damaged cabinet. Report any damages to the carrier and contact an Eaton service
representative immediately.
2. Use a forklift or pallet jack to move the packaged cabinet to the installation site, or as close as possible,
before unpacking. If possible, move the cabinets using the pallet. Insert the forklift or pallet jack forks
between the supports on the bottom of the pallet .
3. Remove the protective wood/carton container from the cabinet:
CAUTION
• Do not tilt the SPM cabinets more than 10° from vertical or the cabinets may tip over.
4. Remove the inner protective packaging. Retain the parts kit box, ramp brackets, and ramp extension
packed at the top of the cabinet.
a. Straighten the tabs securing the top panel of the wooden container to the side panels of the container.
b. Remove the top panel and retain for later use as a ramp in unloading the cabinet from the pallet.
c. Straighten the tabs securing the side panels of the container to the front and back panels of the
container.
d. Remove the side panels.
e. Straighten the tabs securing the front and back panels of the container to the bottom of the container.
f.
Remove the front and back panels.
3 .3 .
Inspecting and Unpacking the SPm
The cabinet is shipped bolted to a wooden pallet and covered with outer protective packaging material (see
Figure 3-3).
WARNING
The Accessory cabinet is heavy (see Table 3-1). If unpacking and unloading instructions are not closely
followed, the cabinet may tip and cause serious injury.
Startup and operational checks must be performed by an authorized Eaton
Customer Service Engineer, or the warranty terms specified become void. This
service is offered as part of the sales contract for the UPS. Contact an Eaton service
representative in advance (usually a two-week notice is required) to reserve a
preferred startup date.
NOTE
Содержание SPM Series
Страница 1: ...System Parallel Module Installation and Operation Manual Eaton UPS Accessories...
Страница 2: ......
Страница 25: ...19 System Parallel Module Notes...
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ...614 01728 00...