background image

Sirios LED Emergency Lighting - Operating instructions

EX500

B+  A-

1-2,5

SWITCH

9. Emergency Operation

Telecommand wiring

Inhibition wiring

TLU500

B+  A-

1-2,5

10. Autotest Operation

Telecommand operation

7

Sirios LED

11. Dimensions

121mm

359mm

168mm

336mm

56mm

384mm

192mm

171mm

361mm

59mm

358mm

60mm

357mm

159mm

153mm

Sirios recessed base

Sirios weatherproof base

8. Mains Operation

Maintained operation

Functional test, every week (7x24h)

Duration test, every 10 weeks (70x24h)

Autotest indications

Manual test

L
N
L1

S1

L
N
L1

S1

L1

S1

ECO operation

S2

MAX

ECO

S2

ONLY @ MAINS

{

C6

SB

SA

1-2,5

A- B+ 

SB

SA

Maintain:

A- B+ 

A- B+ 

G:

G:

Y:

Y:

OK

TEST

Sirios-LED Emergency Lighting

                      

   1-05-250-Sirios LED Instruction Leaflet (R1) - June 2014                     www.eaton.com

Max = 50mA (100%)
Eco  = 33mA (66%)

Содержание Sirios O-SLED

Страница 1: ...Sirios LED Emergency Lighting Instruction and Operation Manual...

Страница 2: ......

Страница 3: ...Emergency Operation 10 Autotest Operation 11 Dimensions SAFETY INSTRUCTIONS The device shall only be used for its intended purpose and in undamaged and awless condition Only genuine Eaton spare parts...

Страница 4: ...30VAC B 230VAC D G G Y Y OK TEST DK SLO HR VC EE LT Sirios LED Emergency Lighting Installation Maintenance 4 Sirios LED Emergency Lighting 1 05 250 Sirios LED Instruction Lea et R1 June 2014 www eaton...

Страница 5: ...C class II Light Source 24 white LED 1 5W Materials White polycarbonate base and re ector Clear polycarbonate diffuser Operation Maintained Non Maintained user selectable Autonomy 1h up to 3h Functio...

Страница 6: ...iring Summary Led position Application Exit Sign Antipanic Escape Route Open Closed Best Good Best Good Good Best Better uniformity on sign Bigger covering area Longer distance in smaller heights lowe...

Страница 7: ...361mm 59mm 358mm 60mm 357mm 159mm 153mm Sirios recessed base Sirios weatherproof base 8 Mains Operation Maintained operation Functional test every week 7x24h Duration test every 10 weeks 70x24h Autote...

Страница 8: ...ge of el ectrical power management across industries experts at Eaton deliver customized integrated solutions to solve our customers most critical challenges Our focus is on delivering the right solut...

Отзывы: