Eaton 9355 UPS (20/30kVA) Installation and Operation Manual 164201626—Rev F
www.eaton.com/powerquality
63
Chapter 9
Parallel Communication
The Powerware Hot Sync CAN Bridge Card, shown in Figure 47, can be installed to provide connectivity for
operational mode control and metering of a parallel system at any UPS in the system.
Figure 47. Powerware Hot Sync CAN Bridge Card
To install the Powerware Hot Sync CAN Bridge Card:
1.
Remove the UPS front door (see page 10).
2.
Remove the communication wiring access plate from the UPS rear panel and punch a hole in it using a
Greenlee punch or similar device (see Figure 48).
3.
Install conduit for the communication wiring.
Figure 48. Communication Wiring Access
Plug-in Terminal Block
Communication
W
iring Access Plate
Содержание Powerware 9355
Страница 1: ...Eaton 9355 UPS 20 30 kVA Installation and Operation Manual...
Страница 2: ......
Страница 3: ...Eaton 9355 UPS 20 30 kVA Installation and Operation Manual...
Страница 99: ......
Страница 100: ...164201626 D 164201626 F...