UPS System Installation
4-4
Eaton
®
Power Xpert
®
9395P-900 UPS Installation and Operation Manual
P-164000501—Rev 09
www.eaton.com/powerquality
Figure 4-2. Removing the ISBM Section Right Side Shipping Bracket
4.
Using a forklift (see the caution statement at the beginning of this procedure), raise the cabinet until the
cabinet bottom clears the pallet by approximately 3 mm (1/8”).
5.
Pull the pallet from under the cabinet. Discard or recycle the pallet and shipping brackets in a responsible
manner.
6.
Carefully lower the cabinet until the cabinet base contacts the floor.
7.
Repeat Steps 2 through 6 for the remaining cabinet.
8.
Shipping Bracket
Bolts
Shipping Bracket
Bolts
Pallet
Right Side Shipping
Bracket
ISBM Removable
Front Panels
For 4-wire
systems only
Содержание Power Xpert 9395P-900 Series
Страница 2: ......
Страница 8: ...This page intentionally left blank...
Страница 33: ...Section I Installation...
Страница 34: ......
Страница 139: ...Section II Operation...
Страница 140: ......
Страница 231: ......
Страница 232: ...P 164000501 6 P 164000501 9...