UPS System Installation
Power Xpert
TM
9395 UPS (450–825 kVA) Installation and Operation Manual 164201725—Rev 10
www.eaton.com/powerquality
4-37
4.9.3
X-Slot Connections
To install wiring to connections:
1.
If not already installed, install the LAN and telephone drops.
2.
Unfasten the front door latch and swing the door open (see Figure 4-1).
3.
Remove the UPS cabinet interface entry conduit landing plates to drill or punch holes (see Figure 4-19).
4.
Reinstall the interface entry plates and install the conduit.
5.
Route and install the LAN, telephone, and other cables to the appropriate X-Slot cards. See Figure 4-24
and Figure 4-30 for X-Slot communication bay locations.
6.
Close the front door and secure the latch.
7.
Refer to the manual supplied with the X-Slot card for operator instructions.
Figure 4-30. X-Slot Communication Bays
NOTE
LAN and telephone drops for use with X-Slot cards must be provided by the
customer.
NOTE
When installing external wiring to X-Slot cards, conduit must be installed to the UPS
cabinet. When installing internal wiring to X-Slot terminals, route the wiring through
the internal opening in the X-Slot communication bay.
X-Slot Communication Bay 1
X-Slot Communication Bay 2
X-Slot Communication Bay 3
X-Slot Communication Bay 4
Содержание Power Xpert 9395 UPS
Страница 2: ......
Страница 27: ...Installation ...
Страница 28: ......
Страница 123: ...Section 2 Operation ...
Страница 124: ......
Страница 249: ......
Страница 250: ... 164201725 10 164201725 10 ...