Eaton Pow-R-Line P2R Series Скачать руководство пользователя страница 12

Instruction Manual 

 

Pow-R-Line Retrofit Panelboards 

Page 

12   

 

 

 

Effective: November 2007 

P1R & P2R Retrofit  Panels 

                                                        

 

For more information visit: www.EatonCanada.ca                

 

                                                                     

11/2007 

 

Water Damage 

DO NOT WORK ON SURFACES OR FLOORS 
WHERE THERE IS STANDING WATER.  
DO NOT WORK ON WET ENERGIZED 
ELECTRICAL 
EQUIPMENT.

 

Major accumulation 

of water or moisture on any 

part of the panelboard can cause catastrophic 
damage to the panelboard. If a panelboard has 
been submerged by more than 2 inches or where 
running or standing water has had contact with 
current carrying parts, it has sustained significant 
damage. 
The panelboard and its components may be 
damaged beyond repair and may need replacement. 

1.  Do not attempt to clean or repair 

water-damaged equipment or 
components. 

2.  De-energize the panelboard at its 

source. 

3.  Do not energize. 
4.  Contact Eaton Electrical for 

replacement. 

Minor 

accumulations of moisture, such as 

condensation, over a short period of time may be 
corrected using heat.  De-energize panelboard. 
Apply approximately 250 watts per vertical section 
for a sufficient period of time until the moisture 
disappears, then remove all heat sources and 
materials used for drying.  Inspect for damage to 
components and any corrosion.  If any damage or 
corrosion is present, contact Eaton Electrical. DO 
NOT RE-ENERGIZE PANELBOARD.  After the 
panelboard has completely dried, remove all 
materials and tools from the equipment. Inspect all 
connections for damage and torque. Re-install all 
covers, fillers, dead-front assemblies and side 
sheets. Conduct panelboard insulation resistance 
testing described in this publication. 

Renewal Parts 

To ensure safety and to maintain UL

TM

 listing and 

CSA

TM

 approval, it is essential that only new parts 

and components from Eaton Electrical be utilized.  
When ordering renewal parts or when requesting 
information on the panelboard, it is essential to 
include as much information as possible. 
Each panelboard will have a nameplate and other 
identification marks with details that will help 
expedite information requests and orders. The 
following may be required to help identify parts and 
information requests. 

___ 

Catalog number of the panelboard  

___ 

Description of the equipment 

___ 

Supply voltage 

___ 

Equipment ratings 

___ 

Description of the part 

___ 

Style number of part, if available 

___ 

Rating of part(s) 

Electrical distribution equipment has a limited life 
span.  As such, the manufacturer cannot guarantee 

the availability of obsolete equipment or parts. 
Equipment replacement may be recommended.  
 

 

WET PANELBOARDS PRESENT A HAZARDOUS 
CONDITION AND MAY CAUSE INJURY OR 
DEATH. DE-ENERGIZE POWER TO ALL 
EQUIPMENT BEFORE SERVICING. 
 

DO NOT WORK ON PANELBOARDS OR ENTER 
AREAS THAT HAVE STANDING WATER. DE-
ENERGIZE ALL EQUIPMENT IN AREAS WITH 
STANDING WATER. 
 

 

PANELBOARD COMPONENTS, INCLUDING 
CIRCUIT BREAKERS, FUSIBLE SWITCHES, 
METERING, ETC., SUBJECTED TO WATER OR 
MOISTURE MAY BE RENDERED UNSAFE. 
REPLACEMENT IS REQUIRED. 

IL01417001E

Содержание Pow-R-Line P2R Series

Страница 1: ...els For more information visit www EatonCanada ca Contents INSTALLATION CRITERIA 2 SAFETY MEASURES 3 PRE INSTALLATION RECEIVING HANDLING AND STORAGE 4 REMOVAL OF EXISTING PANELBOARD INTERIOR 4 INSTALL...

Страница 2: ...er BAB 30 60 100 26 5 14 25 4 5 Breaker BAB 42 60 100 33 5 14 25 4 5 Breaker E or F Frame 18 60 225 30 14 25 4 5 Breaker E or F Frame 30 60 225 36 14 25 4 5 Breaker E or F Frame 42 60 225 42 14 25 4 5...

Страница 3: ...ons of this custom built product Eaton Electrical has made all reasonable efforts to ensure that the instructions in this document are adequate and free of material errors and omissions Eaton Electric...

Страница 4: ...SHOULD INSTALL AND OR SERVICE THIS EQUIPMENT Removal of Existing Panelboard Interior DO NOT work on electrical equipment while energized Verify power entering the equipment is de energized at the sou...

Страница 5: ...t compromising wire bending space requirements as listed in the Appendix Table 1 Ensure that electrical clearance requirements are maintained per NECTM CECTM Care must be taken to ensure that the trim...

Страница 6: ...Never clip cable wire strands in order to fit within connectors If cable wire does not match the rating of the connector contact the manufacturer Use an antioxidant compound if required Insert bare c...

Страница 7: ...lly inspect panelboard insulators bus bar and conductors for damage DO NOT ENERGIZE IF DAMAGE IS FOUND Contact Eaton Electrical Circuit Breakers Circuit breakers are typically shipped in either the op...

Страница 8: ...DE ENERGIZED FAILURE TO SHORT OR DISCONNECT DURING PANELBOARD TESTING WILL RESULT IN FAILURE OF ELECTRONIC COMPONENTS DISCONNECT POWER AT SOURCE BEFORE REMOVING OR INSTALLING FUSES HAZARDOUS VOLTAGE...

Страница 9: ...ns in downstream equipment 3 Verify and follow the sequence of energizing circuits and loads Verify phase sequencing on loads such as motors which can be damaged or destroyed by incorrect phase connec...

Страница 10: ...ces metering equipment and other components Damage to insulation and other surface materials can occur Do Not Use Compressed Air in cleaning Maintenance after Cleaning After cleaning perform a second...

Страница 11: ...t a series of inspections be made at quarterly intervals until the progressive effects of local conditions can be analyzed to determine a regular schedule Panelboard Events and Service Interruptions S...

Страница 12: ...rials and tools from the equipment Inspect all connections for damage and torque Re install all covers fillers dead front assemblies and side sheets Conduct panelboard insulation resistance testing de...

Страница 13: ...for Copper or Aluminum Bus Bar Connections Bolt Size Torque Inch Lbs Torque Foot Lbs 10 30 2 5 65 5 4 5 16 130 10 8 3 8 240 20 600 50 National Electrical Code and NEC are registered trademarks of the...

Страница 14: ...P2R Retrofit Panels For more information visit www EatonCanada ca 11 2007 Notes 2007 Eaton Corporation All Rights Reserved Printed in Canada Publication No PUB50895 November 2007 Eaton Yale Company 5...

Отзывы: