
Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P-164001108—Rev 01
13
Figure 7. Customer Communications Connections, Right Inside Panel
Upstream and downstream are independent: one can be 2-wire and the other 4-wire. By default, Modbus RTU
is 4-wire. For 2-wire Modbus RTU, install jumpers at the Modbus upstream and/or downstream connections on
the display’s backpanel as shown in
.
Customer Ethernet connection for an upstream TCP/IP link is made to the display’s backpanel (
).
33..33
C
Cuussttoom
meerr C
Coonnnneeccttiioonnss B
BC
CM
MS
S D
Duuaall H
Huubb
The BCMS Dual Hub has two BCMS Hub systems in a single enclosure. The two BCMS Hub systems are
completely independent of each another, with separate upstream links and downstream device chains, but
they share a common power supply.
Содержание PDI WaveStar BCMS
Страница 1: ...p n P 164001108 Revision 01 Installation and Operation Manual Eaton PDI WaveStar BCMS Hub...
Страница 4: ......
Страница 8: ...viii Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P 164001108 Rev 01 List of Figures...
Страница 10: ...2 Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P 164001108 Rev 01 Safety...
Страница 28: ...20 Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P 164001108 Rev 01 Installation...
Страница 38: ...30 Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P 164001108 Rev 01 System Setup...
Страница 52: ...44 Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P 164001108 Rev 01 Glossary...
Страница 54: ...P 16400110801 P 164001108 01...