Eaton PDI Revit Model

P-164001110—Rev 01

13

b.

While in the project, the clearance requirement is listed under

Properties

.

Dimensions

Front Clearance

3’ 0”

c.

Clearances can be turned on or off for display purposes only by toggling the corresponding box in the

Properties

tab. When a clearance box is unchecked, the clearance requirement is still in effect, but is

not displayed.

Other

PDI-Box-Front Clearance

44..22

S

Sttaarrtteerr R

Raaiill

Next add a Starter Rail to the bus run. The first bus rail connected to a Standard End Feed must be a Starter Rail
and cannot be a Standard Rail. There can be only one Starter Rail per bus run.

1.

Import the Starter Rail model.

a.

Align the middle axis of the Starter Rail with the middle axis of the Standard End Feed.

b.

To assure proper alignment, you should place a 0–inch dimensional constraint between the Standard
End Feed and the Starter Rail.

Figure 12. Standard End Feed and Starter Rail Dimensional Constraint

0’ - 0”

2.

The length of the Starter Rail can be adjusted in Revit to fit your needs, as follows:

a.

Highlight the Starter Rail.

b.

Select the

Properties

tab.

c.

Click on the Starter Rail drop down menu located at the top of the

Properties

tab.

PowerWave 2 Bus System Models in Revit Project

Содержание PDI Revit

Страница 1: ...p n P 164001110 Revision 01 Power Distribution Units Remote Power Panels Static Transfer Switches Floor Stands PowerWave 2 Bus Systems Eaton PDI Revit Model Instructions...

Страница 2: ...n we thank you for partnering with us and trusting us to maintain your business continuity and preventing downtime at your facility Our suite of backup power power distribution and power management pr...

Страница 3: ...Re ev viit t M Mo od de ells s 7 7 3 1 Selecting Floor Stand Height in a Revit Family Window 7 3 2 Changing the Floor Stand Height in a Revit Project 8 4 4 P Po ow we er rW Wa av ve e 2 2 B Bu us s S...

Страница 4: ...iv Eaton PDI Revit Model P 164001110 Rev 01 Table of Contents...

Страница 5: ...d Feed Front Clearance 12 Figure 12 Standard End Feed and Starter Rail Dimensional Constraint 13 Figure 13 Properties Tab Starter Rail Drop Down Menu 14 Figure 14 Properties Tab Starter Rail List of A...

Страница 6: ...vi Eaton PDI Revit Model P 164001110 Rev 01 List of Figures...

Страница 7: ...els for you installation see paragraph for contact information This document provides instructions on using these models These instructions are intended for knowledgeable Revit users NOTE The term PDI...

Страница 8: ...2 Eaton PDI Revit Model P 164001110 Rev 01 Introduction...

Страница 9: ...th your local or regional sales representatives for help in selecting the correct Revit model s for you configuration 1 The dimensions of the unit s Enclosure are shown in models by solid lines only o...

Страница 10: ...nce requirements are listed in the Properties Tab Dimensions Power Distribution Unit Back Clearance 0 6 Power Distribution Unit Front Clearance 3 0 Power Distribution Unit Left Clearance 3 0 Power Dis...

Страница 11: ...th Clearances On and Off PDU with Clearance turned on PDU with Clearance turned off 4 If the unit has conduit landing areas they are automatically displayed in the model The Static Transfer Switch mod...

Страница 12: ...DI Revit Model P 164001110 Rev 01 Figure 4 Static Transfer Switch Conduit Landing Areas Top and Bottom Top View Conduit Landing Areas Bottom View Conduit Landing Areas Space Requirements for PDUs RPPs...

Страница 13: ...t Family Window or in a Revit Project 3 3 1 1 S Se elle ec ct tiin ng g F Fllo oo or r S St ta an nd d H He eiig gh ht t iin n a a R Re ev viit t F Fa am miilly y W Wiin nd do ow w 1 Open the Revit Fa...

Страница 14: ...cted height 3 3 2 2 C Ch ha an ng giin ng g t th he e F Fllo oo or r S St ta an nd d H He eiig gh ht t iin n a a R Re ev viit t P Pr ro ojje ec ct t 1 Import the Floor Stand model into a Project 2 Hig...

Страница 15: ...t Project Floor Stand Drop Down 4 The drop down list displays all of the available heights of the Floor Stand model within Revit Select a height and the Floor Stand model will automatically adjust to...

Страница 16: ...10 Eaton PDI Revit Model P 164001110 Rev 01 Figure 8 Revit Project Floor Stand Available Height List Selecting Floor Stand Height in Revit Models...

Страница 17: ...amperages but parts must be matched by amperage PowerWave 2 Bus Systems are available in 250A 400A and 800A systems Part models are listed by part name and amperage Choose the part model corresponding...

Страница 18: ...ring Standard End Feed with Monitoring 2 Place the Standard End Feed anywhere in the project space 3 Clearances a The Standard End Feed s front clearance is shown by dashed lines of by dashed lines wi...

Страница 19: ...tandard End Feed must be a Starter Rail and cannot be a Standard Rail There can be only one Starter Rail per bus run 1 Import the Starter Rail model a Align the middle axis of the Starter Rail with th...

Страница 20: ...engths 4 4 3 3 S St ta an nd da ar rd d R Ra aiill All bus rails added to the bus run after the first rail are Standard Rails 1 Import the Standard Rail model into the project 2 Click to place as many...

Страница 21: ...m reference line to the rails dimensions under each rail must be the same Figure 16 Multiple Standard Rails Dimensional Constraint 0 5 3 8 0 5 3 8 0 5 3 8 0 3 1 8 0 0 5 The length of the Standard Rail...

Страница 22: ...ge er rs s V Ve er rt tiic ca all For Hanging the bus run attach the Hanger Brackets to rails 1 Make sure that the project is in Floor Plans Level 1 view This makes it easier to place the Hanger on th...

Страница 23: ...s and there are several models available More than one type of Tap Off Box may be used on the same rail 2 Click to place as many Tap Off Boxes as you need on the rail 3 Align the middle plane of each...

Страница 24: ...Rev 01 Figure 22 Tap Off Box Dimensional Constraint 0 6 0 0 5 Each Tap Off Box has a clearance that is displaced in the same way as for the Standard End Feed Figure 23 Tap Off Box Clearances PowerWave...

Страница 25: ...ing its Clearance box under Properties Other PDI Front Clearance 4 4 7 7 A As ss se em mb blle ed d B Bu us s S Sy ys st te em m V Viie ew ws s Your fully assembled PowerWave 2 Bus System model should...

Страница 26: ...20 Eaton PDI Revit Model P 164001110 Rev 01 Figure 25 PowerWave 2 Bus System Model with Clearances turned On PowerWave 2 Bus System Models in Revit Project...

Страница 27: ...te Eaton Product Warranty https www eaton com content dam eaton products backup power ups surge it power distribution backup power ups portfolio eaton three phase ups warranty pdf To view the End User...

Страница 28: ...P 16400111001 P 164001110 01...

Отзывы: