background image

Warning - 
Intellectual Property Rights  

Eaton wishes to make it clear that it owns intellectual property rights in the 
product which it manufactures (whether or not listed in this leaflet) and that it 
will take legal action against any party found to be manufacturing, using, or 
selling any article which infringes the company’s intellectual property. All 
marks in this document identified with an R symbol or a TM symbol adjacent 
to the mark are trademarks of Eaton. 
 
 
© 2019 Eaton Electric Limited. 
All rights reserved.                                      www.eaton.com/recycling 

The use to which this product is put and its place of installation is outside our 
control. Particular care should therefore be taken to follow the instructions 
given here and to ensure their continued availability in conjunction with the 
use of the product. 
No responsibility can be accepted by us if these instructions are disregarded. 
Further copies of these instructions and information concerning the 
installation and proper use of this product can be obtained by contacting the: 

Technical Services Department 
Eaton Electric Limited, Middleton, Manchester, M24 1GQ. 
Tel: +44(0)8700 545 333, 
email: [email protected] 

2. Alternative SPD position is adjacent to first outgoing way in the Meter Cableway which allows the SPD Status Indicator to be 
viewed externally through a meter aperture. 
Mount the SPD in the LH cableway for shortest possible wire installation and optimal viewing of the SPD status indicators, 
through the nearest meter aperture. 
 

 

 

The 4 Pole NZM1 must be fitted on the FIRST outgoing way to minimise the Earth connecting wire length.  

Grommet 

 

INSTALLATION INSTRUCTIONS: 

3. CABLE SPD. (As shown in Fig.1 or 3) 

• Excessive wire length and sharp bends degrade SPD performance: 
therefore, avoid sharp bends when at all possible and cut excessive 
wire lengths to suit the installation.

 

• 

Refer to phase ID printed on SPD device for Connecting MCCB Phase 

wires N, L1, L2 & L3.  

• 

Bind Cables together with Cable ties for optimum SPD performance. 

• 

Connect the EARTH wire to the nearest bolt on common earth. (see 

Fig.1 or 3) 
4. Energise the System. 
• The Indicator should remain green. If the indicator turns RED, de-
energise and contact the Technical Services department. (See below).

 

Fig.3 SPD Position in Cableway 

 

Fig.4 SPD Window in Meter Cableway

 

Fig.5 Wiring Diagram

 

SPD Status 
Viewing Window 

Earth Cable route shown 
as Compartmentalised.  
For Group mounted route 
cable through panelboard. 

N  E 

L3 

L2 

L1 

L3 

L2 

L1 