Instructional Leaflet 

IL019116EN

Effective July 2016

Installation guidelines for users of Magnum DS 

Low-Voltage Front-Access Switchgear Assemblies 

for seismic applications 

EATON

 www.eaton.com

2.00

(50.8)

Elevation view

Wall steel

99.00

(2514.6)

Wallmount brace

a

 

b

c

Figure 3. Welding of indoor structures to imbedded wall steel—front-access Magnum switchgear

0.19 inches (4.8 mm) weld, 4.00 inches (101.6 mm) long at two places on top of each section starting 0.50 inches (12.7 mm) from each edge of structure.  

See 

Figure 1

 for front-access front compartment bottom pan weld instructions.

For nuclear installations, weld per AWS D1.1, alternatively, welding procedures and personnel qualifications may be performed IAW ASME BPVC Section IX  

and the inspections be performed IAW AWS D1.1, and/or D1.3 and/or D9.1.

A distance of 2.00 inches (50.8 mm), between the wall and the rear of the switchgear, is required to properly secure Front-Access Switchgear when using the rear wallmount brace.

Содержание Magnum DS Series

Страница 1: ...W ASME BPVC Section IX and the inspections be performed IAW AWS D1 1 and or D1 3 and or D9 1 See foundation drawings provided for the specific project to identify anchoring locations 2 Magnum DS Front...

Страница 2: ...ure See Figure 3 for front access wall brace weld instructions b Internal bracket on each end of line up to be plug welded to floor steel c For nuclear installations weld per AWS D1 1 alternatively we...

Страница 3: ...gear a 0 19 inches 4 8 mm weld 4 00 inches 101 6 mm long at two places on front of each section starting 0 50 inches 12 7 mm from each edge of structure b Internal bracket on each end of line up to be...

Страница 4: ...inches 101 6 mm long at two places on top of each section starting 0 50 inches 12 7 mm from each edge of structure See Figure 1 for front access front compartment bottom pan weld instructions b For n...

Страница 5: ...B 1 2 inch tie down hardware 1 2 inch tie down hardware 1 2 inch tie down hardware a b Figure 4 Magnum switchgear front access rear frame seismic wall brace and front compartment seismic brace informa...

Страница 6: ...hipped installed on gear Detail B A B 1 2 inch tie down hardware 1 2 inch tie down hardware C 1 2 inch tie down hardware Detail C Rear frame floor brace shipped installed on Switchgear 1 only Switchge...

Страница 7: ...talled on switchgear after the switchgear is secured to wall a c Figure 6 Magnum switchgear front access rear frame seismic wall brace arc resistant specific information a Secure enclosure to pad and...

Страница 8: ...Low Voltage Front Access Switchgear Assemblies for seismic applications Instructional Leaflet IL019116EN Effective July 2016 Detail A A 1 2 inch tie down hardware Rear frame floor brace shipped instal...