8

MERCURY SWITCH TO MICROSWITCH RETROFIT KIT KA349WE INSTALLATION INSTRUCTIONS 

  MN280022EN   October 2015

Install microswitches SW1 and SW 3 and new switch 

cam

Preparing main shaft

1.  Block mechanism with a screwdriver or other device to 

prevent plungers from descending into main contacts 

when tension is relieved (Figure 19).

Figure 18.  Mechanism blocked with screwdriver.

2.  Detach large lower spring (Figure 20) to relieve tension 

on operating mechanism.

Figure 19.  Spring attachment in lower part of 

mechanism.

3.  Remove and discard two large retaining E rings from 

main shaft (Figure 21).

4.  Remove the machine screw, spacer, and nut that 

connect the main shaft to closing contactor toggle.

Figure 20.  Items to remove on main shaft.

5.  Use punch to remove roll pin holding old SW1 cam. 

Discard roll pin. (Figure 21).

6.  Remove large roll pin to free shaft. Save roll pin.
7.  Slide main shaft aside to gain clearance for removing 

old microswitch cam. Note orientation of cam on shaft. 

Remove and discard cam.

Install new cam for SW1

1.  Slide new switch cam (Item 15) onto main shaft. Orient 

cam as shown in Figures 22 and 23.

Figure 21.  Orientating cam for switches SW1 and SW3.

Figure 22.  Cam installed. Note position of spring and 

roll pins.

2.  Reinsert main shaft into frame.
3.  Use new spring pin (Item 17) from kit to secure cam on 

main shaft.

4.  Reinsert the saved, large roll pin.
5.  Attach two new E rings (Item 16) to main shaft.
6.  Reinstall machine screw, spacer, and nut connecting 

main shaft to closing contactor toggle.

Large roll pin

Main shaft

Spring pin

Cam

Push down 

to position switch

before tightening 

Spring Pin
Cavity

Attach cable leads to

Common and Open terminals

(both switches)

Switch SW1     

Mounting

 bracket

Rotary
Solenoid

Frame

Slotted Hole

Cam flat nearest frame 
faces up toward switch     

Switch SW3 on far side of bracket     

Old switch SW1 cam

Closing contactor toggle 

E ring

Main shaft

Large roll pin

Содержание KA349WE

Страница 1: ...Mercury switch to microswitch retrofit kit KA349WE installation instructions COOPER POWER SERIES Reclosers MN280022EN Effective October 2015 Supersedes S280 40 10 April 2014...

Страница 2: ...FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTE...

Страница 3: ...duction 1 Handling and storage 1 Quality standards 1 Additional information 1 INSTALLATION Reposition contact bar 3 Disconnect terminal wires 3 Remove microswitch switch SW1 4 Remove mercury switch SW...

Страница 4: ...hen working around high voltage lines and equipment and support our Safety For Life mission Safety information DANGER Hazardous voltage Contact with hazardous voltage will cause death or severe person...

Страница 5: ...the carton for signs of damage Unpack the kit and inspect it thoroughly for damage incurred during shipment If damage is discovered file a claim with the carrier immediately Handling and storage Be ca...

Страница 6: ...SW1 Main Shaft Grommeted Cable Exit Hole and Terminal Block Rotary Solenoid Plastic Cable Retainer Switch SW2 Handle Shaft Yellow handle manual trip shaft Contact Position Indicator Shaft H Bracket S...

Страница 7: ...at points indicated in Figure 2 1 Remove C rings from contact bar retainer pin at trip solenoid end of mechanism and discard 2 Note position of any washers then remove and save them 3 Slide pin aside...

Страница 8: ...ordance with all federal state and locally approved mercury disposal guidelines and regulations Figure 6 Removing switch SW3 from main shaft Figure 7 Springs and retaining pins Remove mercury switch S...

Страница 9: ...lations 10 Scribe new handle shaft assembly Item 3 to mark orientation of cam and lever to shaft and shaft to frame Carefully remove roll pins cam and lever from new shaft Figure 9 Figure 10 Switch SW...

Страница 10: ...itch SW2 4 Place cable over spacer near cable hole then securely tighten assembly to frame Use the two smaller spacers Item 4 machine screws Item 5 and self locking elastic stop nuts Item 6 to attach...

Страница 11: ...ing retaining pin through the two large springs spacers and new C rings Item 21 Tighten C rings 4 With H bracket disengaged gently push down on switch SW2 until hearing a click as switch contact encou...

Страница 12: ...ave roll pin 7 Slide main shaft aside to gain clearance for removing old microswitch cam Note orientation of cam on shaft Remove and discard cam Install new cam for SW1 1 Slide new switch cam Item 15...

Страница 13: ...new cable retainer in the same position used by the old one 5 At the terminal block make the following connections refer to Figures 5 and 27 for terminal identification A Switch SW1 connect leads to...

Страница 14: ...2 10 KA30090019 ALUMINUM SPACER 2 11 7215 15 110137A SLOTTED RD HD MACH SCR 10 24 UNC 2A 2 12 KA20200013 ELASTIC STOP NUT SS 10 24 2 13 9011 32 010000A EXTERNAL TOOTH LOCKWASHER 10 PL F 2 14 KA2048050...

Страница 15: ...t review its positioning If positioned correctly review switch terminal and terminal block connections If all connections are correct check switch to make sure it actually opens and closes as its arm...

Страница 16: ...ited States Eaton com cooperpowerseries 2015 Eaton All Rights Reserved Printed in USA Publication No MN280022EN KA2048 506 Rev 04 Eaton is a registered trademark All trademarks are property of their r...

Отзывы: