Eaton 93PM Integrated Battery Cabinet (IBC-L, IBC-LH [432V], and IBC-LH [480V]) Installation Manual 164000228—Rev 08
13
C
Chhaapptteerr 33 IInnssttaallllaattiioonn P
Pllaann aanndd U
Unnppaacckkiinngg
Use the following basic sequence of steps to install the Eaton 93PM Integrated Battery Cabinet-Large (IBC-L)
or Integrated Battery Cabinet-Large High Rate (IBC-LH):
1.
Create an installation plan for the IBC.
2.
Prepare your site for the IBC.
3.
Inspect and unpack the IBC.
4.
Unload and install the IBC, and wire the system.
5.
Complete the Installation Checklist.
6.
Have authorized service personnel perform preliminary operational checks and start up the system.
NOTE
Startup and operational checks must be performed by an authorized Eaton Customer
Service Engineer, or the warranty terms specified in
become void.
This service is offered as part of the sales contract for the UPS. Contact an Eaton service
representative in advance (a minimum two-week notice is required) to reserve a
preferred startup date.
33..11
C
Crreeaattiinngg aann IInnssttaallllaattiioonn P
Pllaann
Before installing the IBC, read and understand how this manual applies to the system being installed. Use the
procedures and illustrations in this section to create a logical plan for installing the IBC. This section contains
the following information:
•
Physical features and requirements, including dimensions
•
Power wiring installation notes
•
Location of conduit and wire entry landing plates
•
Location of power terminals
33..22
P
Prreeppaarriinngg tthhee S
Siittee
For the UPS system to operate at peak efficiency, the installation site should meet the environmental
parameters outlined in this manual. The operating environment must meet the weight, clearance, and
environmental requirements specified.
33..22..11
EEnnvviirroonnm
meennttaall aanndd IInnssttaallllaattiioonn C
Coonnssiiddeerraattiioonnss
The UPS system installation, including the IBC, must meet the following guidelines:
•
The system must be installed on a level floor suitable for computer or electronic equipment.
•
The system must be operated at an altitude no higher than 1500m (5000 ft) without derating. For additional
information and assistance with high altitude operation, contact an Eaton service representative (see
paragraph
).
•
The system must be installed in a temperature and humidity controlled indoor area free of conductive
contaminants.
•
Specifications are subject to change
Failure to follow guidelines may void your warranty.
The basic environmental requirements for operation of the IBC are:
•
The battery cabinet is rated for operation in up to a 40°C (104°F) ambient temperature.
Содержание IBC-L