
22
Eaton Green Motion DC EV Charger User’s Manual P-164001189—Rev 01
C
Chhaapptteerr 44 IInnssttaallllaattiioonn
Step 1: Removal of steel box and foam packaging material
• Straighten all the tongue buckles on the steel belt box with a screwdriver.
• Remove the top steel strip planks.
• Remove the left and right steel strip planks.
• Remove the front and rear steel strip planks.
• Remove all foam and other packing material.
STEP -1
screw driver
tongue buckle
Step-A
Step-B
Step-C
Step-D
Step-E