Flexi -3G Installation & Commissioning Manual
Chapter 4. Battery Installation
Document No: - 4493-CM-EN-10989402
Page 45 of 94
Copyright © 2008-2009 Eaton Corporation. All Rights Reserved
4.6. Populating Additional Battery Shelves if Required
1
Battery Cabinet
2
Battery Shelf 1
3
Battery Shelf 2
4
Battery Shelf 3
5
Battery Shelf 4
Fig. 4-9 2 Battery Shelves Populated
1.
If additional battery strings are required, follow the procedure in section 4.5. for Fitting
the Batteries on page 39 for Battery Shelf 2.
1
2
3
4
5