background image

 

ExoCab34 outdoor cabinet 

User and Installation Guide 

 
 

©Eaton Corporation 2018. All rights reserved. 

Revision 0.1 

Page 10 of 35 

 

3.3

 

Thermal Overview 

This overview shows key points for the various cooling options. 
Please refer to product data for temperature and power ratings for each option. 
 

Standard 

 

 
The 

Standard 

option provides a fully sealed cabinet with a 

maximum level of equipment protection. 
Internal air is circulated by equipment fans. 
Heat is dissipated through the cabinet wall. 

Advantages include; 

 

Low cost  

 Zero 

maintenance 

 

High degree of protection from environmental 
contaminants 

 

Recommended for low power equipment, including 
equipment needing a high level of protection. 

 

Internal temperature is always above outside 
temperature. Ensure equipment is rated for the full 
range of internal temperatures. 

Vented 

 

 
The 

Vented

 option allows a higher heat dissipation than the 

Standard option by drawing outside air through the enclosure. 

Characteristics include; 

 

Low cost  

 

Air filter provides some protection against 
environmental contaminations.  

 

The filter requires periodic cleaning and replacement. 

 

Recommended for clean environments or with 
hardened  equipment. 

 

Internal temperature is close to ambient. 

Heat exchanger 

 

 

The 

Heat Exchanger

 option provides a cost-effective 

enclosure providing full environmental protection and an 
increased power rating compared to the Standard option. 

Characteristics include; 

 

High degree of protection from environmental 
contaminants 

 

Internal temperature is always above outside 
temperature. Ensure equipment is rated for the full 
range of internal temperatures. 

 

Low energy cost and minimal maintenance. 

 

Air conditioner 

 

 
The 

Air conditioner 

option provides a fully sealed cabinet 

with a maximum level of equipment protection. 
The air conditioner provides a stable internal temperature and 
high power dissipation rating. 

Characteristics include; 

 

High degree of protection from environmental 
contaminants 

 

Recommended for any equipment, including 
equipment needing a high level of protection and 
equipment with a restricted temperature rating. 

 

Internal temperature is maintained at a stable level. 

Содержание ExoCab34

Страница 1: ...USER S AND INSTALLATION GUIDE ExoCab34 Outdoor Enclosure...

Страница 2: ...for future reference The contents of this manual are the copyright of the publisher and may not be reproduced even extracts without the written approval of Eaton Corporation Every care has been taken...

Страница 3: ...equipment 16 4 2 Cautions 16 5 Install cabinet 16 5 1 Overview of tasks 16 5 2 Concrete foundation 16 5 3 Place cabinet 19 5 4 Fit air conditioner roof if required 20 5 5 Fit heat exchanger door if r...

Страница 4: ...ium level of risk which if not avoided could result in serious injury or death or damage to your machine CAUTION CAUTION indicates a hazard with a low level of risk which if not avoided could result i...

Страница 5: ...ls are used to indicate an action that must be taken General symbol for mandatory action Disconnect from power source Read the manual or instructions 1 3 Conventions used in this document This documen...

Страница 6: ...ormed by a service engineer from the manufacturer or from an agent authorized by the manufacturer WARNING The UPS is powered by its own energy source batteries The output terminals may be energized ev...

Страница 7: ...y opening the corresponding battery circuit breaker Check if the battery is inadvertently grounded If it is remove the source of the ground Contacting any part of a grounded battery can cause a risk o...

Страница 8: ...s People who plan and perform the installation of the ExoCab34 People who use the ExoCab34 This document provides guidelines for how to install commission and operate the ExoCab34 and a UPS installed...

Страница 9: ...ir cooled heat exchanger and air conditioned The ExoCab34 includes a galvanised steel or aluminium mounting plinth and lifting eyes The cabinet is constructed from marine grade aluminium and stainless...

Страница 10: ...e Low cost Air filter provides some protection against environmental contaminations The filter requires periodic cleaning and replacement Recommended for clean environments or with hardened equipment...

Страница 11: ...1 Page 11 of 35 3 4 Battery cooling Where batteries are installed they may be separated from the main equipment compartment The batteries may be cooled by a door mounted TEC cooler 3 5 Exploded views...

Страница 12: ...cabinet User and Installation Guide Eaton Corporation 2018 All rights reserved Revision 0 1 Page 12 of 35 Figure 2 Exploded views Heat exchanger Air conditioner Door or optional rear cover Door or opt...

Страница 13: ...19 inch equipment rails Full height 19 inch equipment mounting 34U is available for standard 19 inch equipment mounting Split cabinet equipment mounting Equipment requiring different environments can...

Страница 14: ...Eaton Corporation 2018 All rights reserved Revision 0 1 Page 14 of 35 3 7 Cabinet Equipment Mounting Dimensions Top View cross section of cabinet Full Cabinet Front View Split Cabinet Front View Cabl...

Страница 15: ...nted These vary according to the cabinet options Vented Side Section view Keep 20mm mm front and rear clear for ducting Heat exchanger Side Section view Keep 2U at the top clear Keep 125 mm at the fro...

Страница 16: ...te foundation See details on page 16 2 Bolt down Cabinet See details on page 19 3 Fit air conditioner roof if required See details on page 20 4 Fit heat exchanger door if required See details on page...

Страница 17: ...ights reserved Revision 0 1 Page 17 of 35 Top view Door opening space required Top view Plinth section bolt down holes Figure 4 Installation clearances Standard and Fresh Air Cooled Air Conditioned He...

Страница 18: ...ny expected flood water Step 4 Install duct pipes Specific design details for the base are not given here because of varying site conditions and seismic restraint requirements In general the base must...

Страница 19: ...ectrolytic corrosion Procedure complete 5 3 Place cabinet Step 1 Lift and position cabinet 1 Check that the base is clean and the bolt down sockets are free of debris 2 Lift the cabinet minus batterie...

Страница 20: ...mounting plate front and rear with the 4 x M6 fasteners supplied 5 5 Fit heat exchanger door if required 1 Open Door 2 Remove circlips from hinge pins 3 Remove hinge pins IMPORTANT to support door 4 R...

Страница 21: ...on battery installation The following are recommended Battery Installation Practices These supplement the specific installation instructions of the relevant battery manufacturer Battery Installation...

Страница 22: ...All panels are in place The cabinet interior is clean and all work debris has been removed 7 2 Apply AC Power A registered electrician or suitably qualified person must check the integrity of the inst...

Страница 23: ...n LED is off Fan dc supply is off Check fan dc supply is 48 54V Fan controller faulty Replace faulty fan controller see details on 23 Fan Fail alarm and or fan controller alarm LED on LED on fan s fau...

Страница 24: ...an controller 1 Label then disconnect all wires 2 Connect all wires to the new fan controller 3 Fit the new controller into the cabinet Step 5 Switch on supply 1 Switch on the AC power to the cabinet...

Страница 25: ...rnal cover mounting screws Remove external heat exchanger cover fasteners inside of door Once the internal fasteners are removed use a sharp knife to cut the sealant around the cover Remove the old se...

Страница 26: ...erved Revision 0 1 Page 26 of 35 Internal fan access Remove top duct Remove heat exchanger access panel Remove fan attached to mounting bracket Remove fan 1 Remove duct 2 Remove cover 3 Remove fan and...

Страница 27: ...ing to insulate the connections Step 4 Fit new fan Reverse the removal process shown in Step 2 After refitting the External cover apply sealant to the top and sides use a clear neutral cure silicone s...

Страница 28: ...tion Guide Eaton Corporation 2018 All rights reserved Revision 0 1 Page 28 of 35 9 Appendix A 93PS20 93PS40 UPS options 9 1 Layout Refer also to the appropriate UPS User s and Installation Guide suppl...

Страница 29: ...Installation Guide Eaton Corporation 2018 All rights reserved Revision 0 1 Page 29 of 35 10 Appendix B 9PX UPS option Refer also to the appropriate UPS User s and Installation Guide supplied separatel...

Страница 30: ...b34 outdoor cabinet User and Installation Guide Eaton Corporation 2018 All rights reserved Revision 0 1 Page 30 of 35 11 Appendix C Wiring diagrams 11 1 ExoCab34 with heat exchanger door or air condit...

Страница 31: ...onitoring by web SNMP is provided Versions 1 Standard closed enclosure A sealed enclosure for equipment with small heat dissipation requiring a high level of protection from the environment 2 Fresh ai...

Страница 32: ...ExoCab34 outdoor cabinet User and Installation Guide Eaton Corporation 2018 All rights reserved Revision 0 1 Page 32 of 35...

Страница 33: ...and rear of cabinet Temperature ratings Closed enclosure Heat dissipation Maximum 200W Internal temperature rise 10 C for 100W internal dissipation 20 C for 200W internal dissipation Temperature rati...

Страница 34: ...ExoCab34 outdoor cabinet User and Installation Guide Eaton Corporation 2018 All rights reserved Revision 0 1 Page 34 of 35 13 Appendix E Concrete plinth drawing...

Страница 35: ...ia Eaton Industries 10 Kent Road Mascot 2020 NSW Australia T 1300 877 877 E aupqsales eaton com New Zealand Eaton Industries Company 106 Wrights Road Christchurch 8041 NZ T 03 335 3126 E nzorders eato...

Отзывы: