background image

BEFORE INSTALLATION

A.

Verify that the system is wired in a Three Phase Star configuration and that the voltage rating of

 

the system matches the voltage rating of the SPD as shown on label.
If Neutral to Earth voltage is greater than 5 VAC, then a problem may exist in the electrical

 

system. The SPD may be installed; however, a qualified person should be consulted to

 

correct 

the problem.

B.

The SPD must be connected to the Memshield 3 Distribution Board via the
Triple Pole 63A Miniature Circuit Breaker (MCB) supplied.  

NOTE: 

If the SPD is

to be used in conjunction with equipment other than a Memshield 3 Distribution Board,
the SPD must be connected via an appropriate protective device for the location of the

 

installation. 

NOTE FOR CLEAN EARTH:

If the system utilises a clean earth, the green/yellow earth wire must be connected to the clean
earth bar.

INSTALLATION INSTRUCTIONS:

1.

ISOLATE INCOMING ELECTRICAL SUPPLY.

2.

SPD MOUNTING POSITION
The SPD should be mounted for the shortest and straightest possible wire installation from
the SPD to the MCB and Earth/Neutral Busbar.  It is strongly recommended that the FIRST
outgoing MCB way be installed to minimise the connecting wire length.

Excessive wire length and sharp bends degrade SPD performance:

therefore, avoid excessive wire length and sharp bends when at all possible.

3a.

ASSEMBLE SPD ENCLOSURE TO STANDARD TYPE B BOARD (As shown in Fig.1.).

• Position the SPD enclosure on the right hand side of the B-Board (Note that the door should open

to the right) and align it so that the handle is approximately in line with the bottom of the lowest MCB.

• Using the SPD enclosure as a template, mark position of pre-pierced holes (4 off) onto the B-Board

side  panel.

• With care, drill 4 holes 6mm dia into the B-Board and 1 hole 27mm dia in line with the middle

of the MCB. Fig.1.

• Remove burrs and ensure both enclosures are free of debris.
• Bolt both enclosures in position and insert grommet (ensure that the nuts and shakeproof

washers are inside the B-Board).

3b.

ASSEMBLE SPD ENCLOSURE TO SMART METER TYPE B BOARD

• Remove right hand side plate of the Smart Meter Board.
• Using the SPD enclosure as template, align it with the pre-pierced hole over the lowest gland

aperture, and with care, drill 3 corresponding holes into the Smart Meter Board.

• Remove burrs and ensure both enclosures are free of debris
• Bolt both enclosures in position (ensure that the nuts and shakeproof   washers

are inside the Smart Meter Board).

• Trim right hand side plate to suit and re-fit.

4.

Cable SPD. (AS SHOWN IN FIG.2).

Keep the wire(s) as short as possible for optimum SPD performance.

Connect the EARTH wire to the nearest bolt (see Fig.2.).

• Refer to the NOTE for systems utilising the clean earth.

Connect the NEUTRAL wire to the Neutral Busbar.

Connect Phase wire to the MCB at L1, L2 & L3.

5.

Energise the System.
• For the SPD ‘EM3SSK3T2’ the Indicator should remain green.

If the indicator turns RED, de-energise and contact the Technical Services department.

• For the SPD ‘EM3SSK3T12’ the red Indicator should remain locked in position.

If the red indicator POPS UP, de-energise and contact the Technical Services department.
(See  below).

Warning  -

Intellectual  Property  Rights

Eaton  wishes  to  make  it  clear  that  it  owns  intellectual  property  rights  in  the

 

product  which  it  manufactures  (whether  or  not  listed  in  this  leaflet)  and  that

 

it  will  take  legal  action  against  any  party  found  to  be  manufacturing,  using,

 

or  selling  any  article  which  infringes  the  company’s  intellectual  property. All

 

marks  in  this  document  identified  with  an  R  symbol  or  a  TM  symbol  adjacent

 

to  the  mark  are  trademarks  of  Eaton.

C

    20

18

  Eaton  Electric  Limited.

   

All  rights  reserve

d.    

              www.eaton.com/recycling

The  use  to  which  this  product  is  put  and  its  place  of  installation  is  outside  our

 

control.  Particular  care  should  therefore  be  taken  to  follow  the  instructions  given

 

here  and  to  ensure  their  continued  availability  in  conjunction  with  the  use  of  the

 

product.

No  responsibility  can  be  accepted  by  us  if  these  instructions  are  disregarded.

 

Further  copies  of  these  instructions  and  information  concerning  the  installation

 

and  proper  use  of  this  product  can  be  obtained  by  contacting  the:

Technical  Services  Department

Eaton Electric Limited, 

Middleton, Manchester, M24 1GQ

.

Tel: +44(0)8700 545 333, 

Tel: +44(0)121 685 2100, 

email: [email protected]

Отзывы: