
Installation instructions
Complete Tee Connector kit includes:
1 – Moulded tee connector
1 – Clamping screw
1 – Basic insulating plug
1 – Rubber cap
1 – Cable adapter
1 – Bi-metallic conductor contact
– Silicone lubricant
– Paper towel
– Installation instructions
Step 1
1. Train the cable to the desired finished position. (See
Figure 2.) Be sure that the cable is long enough to
permit movement of the tee connector from the
apparatus bushing to a standoff bushing.
2. Initially, cut the cable 100 mm past the bushing
centerline.
ote:
N
This is the initial length of the cable to ensure that
the screen wires are long enough to reach the
earthing eye on the tee connector. The cable will
be cut to its final length in a later step.
3. Remove 435 mm of the cable sheath.
4. Fold the screen wires back over the sheath and
secure them with two wraps of vinyl tape. (This step
is optional. The vinyl tape is not included in the kit.)
5. Position the cable to its final position and cut it 50
mm from the centerline of the apparatus bushing.
See Figure 3.
Figure 2.
100 mm
VINYL TAPE
SCREEN WIRES
INSULATION SCREEN
435 mm
WARNING
Hazardous voltage. All associated apparatus must be
de-energized during installation and/or maintenance.
Failure to comply may result in death, severe personal
injury and equipment damage.
2
DT400/436 tee connector installation instructions
MN650001EN September 2014 www.cooperpower.com