Effective
10
/00
Page 13
IL 33-K2C-3
F.
Route the DTA Extension Harness up through
the Breaker, then through the existing hole in
the Breaker Platform. Insure that the DTA
Extension Harness is clear of all moving parts
within the Breaker.
For Kits Supplied with a Breaker Mounted CPT
Only.
STEP 6:
INSTALLING THE BREAKER
MOUNTED CPT ON THE DTA
MOUNTING ANGLE
Fig. 17 Routing of the DTA Extension Harness
Fig. 18 Overview – CPT Installed in the Breaker
NOTE:
If a left-hand mounting kit was used to
install the DTA on the DTA Mounting Angle
in Step 4, the Breaker Mounted CPT can
not be installed on the DTA Assembly as
detailed in the following steps. The CPT
will have to be mounted either in another
location on the Breaker or in the Breaker
Cell. Alternative mounting of the CPT is
the sole responsibility of the Retrofitter.
NOTE:
On some versions of the K-1600 / 2000
Breakers originally supplied with a Breaker
Interlock Mechanism, the Breaker
Mounted CPT can not be installed on the
DTA Assembly as detailed in the following
steps. The CPT will have to be mounted
either in another location on the Breaker
or in the Breaker Cell. Alternative mount-
ing of the CPT is the sole responsibility of
the Retrofitter.
www
. ElectricalPartManuals
. com
Содержание digtrip 510 with zone Interlock
Страница 41: ...Effective 10 00 Page 41 IL 33 K2C 3 Notes w w w E l e c t r i c a l P a r t M a n u a l s c o m...
Страница 42: ...Effective 10 00 IL 33 K2C 3 Page 42 Notes w w w E l e c t r i c a l P a r t M a n u a l s c o m...
Страница 43: ...Effective 10 00 Page 43 IL 33 K2C 3 Notes w w w E l e c t r i c a l P a r t M a n u a l s c o m...