![Eaton Cutler-Hammer Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/eaton/cutler-hammer/cutler-hammer_o-and-m-manual_3934640021.webp)
IB01602002E
Page 15
Effective 10/02
These cleats must be
ATVISP, NTVSSP
Figure 4-1 Seismic Tested and Approved Product Mounting Instructions
Seismic Tested and Approved Product Mounting Instructions
In all cases, the unit must be mounted per the outline drawing. In
addition, the floor-mounted units must use the provided cleats.
These cleats must be placed between the head of the bolt and the
sheet metal enclosure. It is also necessary to use 0.5-13UNC Grade
5 or better hex head bolts. These bolts are to be torqued to 50 ft. lbs.
(68 Nm).
Содержание Cutler-Hammer
Страница 35: ......