ote:
N
If concentric neutral cable is not being used,
follow cable preparation directions in shield
adapter kit.
Equipment provided
•
BOL-T Connector Assembly Kit includes:
•
T-body
•
Cable Adapter
•
Insulating Plug with Cap
•
Shear Bolt Connector
•
Silicone Lubricant
•
Instruction Sheet
•
Threaded Stud
Tools required
•
Torque Wrench
•
5/16" Hex Wrench for Splice Application
•
Cable Stripping Tools
•
5 mm or 8 mm Allen Wrench
Installation of connectors
Shear bolt installation procedures
(For compression connector procedures, see page 7)
Prepare the cable
Step 1.
Train cable
•
Position cable vertically so that it is centered between
apparatus bushing and parking pocket, parallel to, and 6"
(152 mm) from apparatus frontplate.
•
Provide adequate cable slack for cable movement
between standoff bushing and apparatus bushing.
•
Support cable as needed to maintain position.
•
Cut cable to length "A" from centerline of bushing. (Refer
to Fig ure 3 and Table 2 for "A" length.
IMPORTANT
Installation Instructions to be used for 600 A, 15/25 kV
Class BOL-T connector with shear bolt connector. Please
see page 7 for installation instructions using a compression
connector.
Figure 3. Line illustration for cable training.
Bushing
Cable
"A"
(See Table 2)
B
C
D
A
Figure 2. Strip back dimensions.
6"
(152 mm)
2
600 A 15/25 kV class BOL-T connector assembly installation instructions for
MN650005EN February 2015