manualshive.com logo in svg
background image

10

Assembling the stop rail for ZB-S cable infeed with 600 mm cabinet depth

Manual: ZB-S central battery system in electrical service rooms EBR-S

   40071860238 (A)   August 2014   www.ceag.de

 760 

 535 

 70.8

 

    

    

    

    

    

    

When mounting to the 

cabinet, ensure you also use 

the serrated washers used 

for fixing the roof plate. (x4)

 752 

 250 

 70.8 

    

When mounting to the 

cabinet, ensure you also use 

the serrated washers used 

for fixing the roof plate. (x4)

Assembling the stop rail for ZB-S cable infeed with 600 mm cabinet depth

Assembling the stop rail for ZB-S cable infeed with 400 mm cabinet depth

GB

Содержание CEAG ZB-S Series

Страница 1: ...sche Betriebsr ume Typ EBR S Zielgruppe Elektrofachkraft Installation instructions ZB S central battery system in electrical service rooms EBR S Target group Qualified electrician Elektrische Betriebs...

Страница 2: ...der Tabelle 1 zu entnehmen ACHTUNG Um Schrauben in das Brandschutzmaterial einschrauben zu k nnen m ssen die L cher hierf r vorgebohrt werden Bohrlochtiefe max 25 mm Schraubenl nge max 25 mm Content...

Страница 3: ...tung montieren siehe Montage und Bedienungsanleitung ELEKTRISCHER BETRIEBSRAUM PRIORACK Elt EBR 4 Leitungen einf hren 5 Anlage gem CEAG Anleitung ZB S anschlie en und in Betrieb nehmen Einbau ZB S 18C...

Страница 4: ...80 692 170 692 170 692 170 692 155 Zubeh r Maximale Anzahl von zus tzlichen Kabelschotts KRS 125 Pro Kabelschott max 26 Leitungen 3 x 2 5 mm oder 10 Leitungen a 3 x 25 16 mm siehe Abb Seite 5 6 6 6 6...

Страница 5: ...71110 nein nein ja ja ja ja ja 3 86 3 86 1 01 1 01 0 60 0 51 0 22 400 350 250 200 150 200 80 4 4 2 2 2 2 2 78 78 26 26 26 26 26 10 10 10 10 10 10 10 2417x1144x736 2417x1144x736 2262x894x586 2262x894x5...

Страница 6: ...Zur Befestigung am Schrank unbedingt zus tzlich die zur Befestigung des Dachbleches verwendeten Zahnscheiben mitverwenden x4 752 250 70 8 Zur Befestigung am Schrank unbedingt zus tzlich die zur Befes...

Страница 7: ...tructions ELECTRICAL SERVICE ROOM PRIORACK Elt EBR 4 Feed in the cables 5 Connect the system in accordance with the CEAG ZB S instructions and carry out commissioning of the system Installation of ZB...

Страница 8: ...0 692 170 692 155 Accessories Maximum number of supplementary KRS 125 cable sealings Max 26 cables per cable sealing 3 x 2 5 mm or 10 cables at 3 x 25 16 mm see figure on page 5 6 6 6 6 6 Plinth with...

Страница 9: ...s yes yes yes yes 3 86 3 86 1 01 1 01 0 60 0 51 0 22 400 350 250 200 150 200 80 4 4 2 2 2 2 2 78 78 26 26 26 26 26 10 10 10 10 10 10 10 2417x1144x736 2417x1144x736 2262x894x586 2262x894x586 2262x894x5...

Страница 10: ...760 535 70 8 When mounting to the cabinet ensure you also use the serrated washers used for fixing the roof plate x4 752 250 70 8 When mounting to the cabinet ensure you also use the serrated washers...

Страница 11: ...11 Manual ZB S central battery system in electrical service rooms EBR S 40071860238 A August 2014 www ceag de GB...

Страница 12: ...besuchen Sie www eaton eu Ihre Ansprechpartner finden Sie unter www ceag de Eaton Industries Manufacturing GmbH Electrical Sector EMEA Route de la Longeraie 7 1110 Morges Switzerland Eaton eu CEAG No...

Отзывы: