8
Eaton BladeUPS DoS Installation Instructions P-164000613—Rev 3
8.
Move and secure the BladeUPS cabinet:
a.
If you are using a NEW or an EXISTING transformer:
Lift the BladeUPS cabinet on top of the
transformer and align it without overhang (see Figure 7). With a 9/16” socket, secure the cabinet to
the transformer with the same bolts, locking washers, and flat washers that previously secured the
cabinet to the pallet.
b.
If you are NOT using a transformer:
Bolt the cabinet to the floor.
Figure 7. Lift BladeUPS Cabinet on Top of the Transformer
Содержание BladeUPS Series
Страница 1: ...Eaton BladeUPS DoS Installation Instructions...
Страница 2: ......
Страница 3: ...Eaton BladeUPS DoS Installation Instructions...
Страница 6: ...Table of Contents ii Eaton BladeUPS DoS Installation Instructions P 164000613 Rev 3...
Страница 31: ......
Страница 32: ...1642017233 P 164000613 3...