50
Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14
Figure 36. Installing the EBM Mounting Brackets
Mounting
Bracket
6-32 Flat-Head
Screws
10. Slide the EBM into the rack.
11. Secure the front of the EBM to the rack using two hex-head screws in each mounting bracket as shown in
.
Figure 37. Securing the EBM Mounting Brackets
Hex-Head
Screws
12. Attach the rear hold-down brackets to the rail and slide the brackets into the slots on the EBM rear panel. (
see
).
Содержание BladeUPS none
Страница 8: ...viii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Table of Contents ...
Страница 12: ...xii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Figures ...
Страница 14: ...xiv Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Tables ...
Страница 20: ...6 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Introduction ...
Страница 134: ...120 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Metering ...
Страница 160: ...16420164914 164201649 14 ...