Installation
Copyright © 2007-2010 Eaton Corporation. All Rights Reserved.
IPN 997-00012-52D July 2010
19
Battery Circuit Breakers
Item Description
Part
Number
1
100A, 1-pole, 80V dc *
Heinemann AM1R-B39-AJ-20-D-DU-52-100-251
2
120A, 2-pole, 80V dc *
Heinemann AM1P-B39-LJ-20-D-AU-52-120-251
* Heinemann AM1R/AM1P Series (UL Listed DIVQ)
Step 3 - Link Battery circuit breaker terminals (if required)
If a 120A, 2-pole battery circuit breaker is fitted then install the supplied link
between the two battery circuit breaker terminals.
Do not tighten the terminals until the battery cables are connected.
"
Battery circuit breaker link (for use with a 2-
pole battery circuit breaker only)
#
Battery circuit breaker terminals
Procedure complete
Task 3 - Mount the APS in the Rack
Step 1 - Check clearances
APSs require the following minimum clearances for access and/or adequate air flow:
Front:
24"
(600mm)
Rear:
If top access is unrestricted:
4” (100mm)
If top access is restricted:
24" (600mm)
Top:
3" (75mm) minimum from other equipment in the rack.