Section 3: Installation

3.1 Procedure

To install Ampgard AR equipment, refer to the following figures and 

tables for information specific to the arc resistant product and refer 

to IB48041 for information specific to 400 A starter or IB48043 for 

information specific to 800 A starter.

Figure 12. Footprint and lag-down bolt locations. (Shown with 

24” W Inc. line and 36” W starter for non-seismic application.)

1.  These are the locations of 0.88 in. (22.4 mm) diameter mounting 

holes for securing an Ampgard AR vertical section/structure to a 

finished foundation.  Use 0.50 in. (12 mm) diameter SAE Grade 5 

hardware tightened to specifications shown in 

Table 5

 is recom-

mended. 

 

Use of other post-installed mechanical anchor systems, bonded/

adhesive type systems, pre-installed cast-in-place systems 

such as shear lugs, L-bolts, and J-bolts, or plug welding the arc 

resistant MV MCC vertical section at the mounting hole locations 

to cast-in-place structural steel materials or to a steel house 

foundation is sole responsibility of others.  Alternative mounting 

systems must have equal or greater average ultimate tensile and 

shear load capabilities as SAE Grade 5 hardware.  In addition 

to the load capabilities of the mounting system, the bearing 

strength and bearing surface area at each arc resistant MV MCC 

vertical section mounting hole location must be considered.  

Consult a licensed structural or civil engineer prior to selecting a 

mounting system if a system other than that recommended is 

preferred.

2.  This is a medium-voltage cable conduit entry locations when 

entering from the floor.  See shop order floor plan for recom-

mended conduit locations when bottom entry is being used.  

Conduit projection must not exceed 2.00 in. (50.8 mm).

3.  Location of low-voltage control conduit wiring opening.  Conduits 

are limited to a projection of 1.00 in. (25.4 mm) above the 

finished floor or inside the top cover when such conduit entry is 

from the top.  Maximum conduit size is 1.25 in. (31.8 mm).

4.  This is a medium-voltage cable conduit entry locations in an 

incoming line vertical section when entering from the floor.  See 

the shop order floor plan for recommended conduit locations 

when bottom entry is being used.  Conduit projection must not 

exceed 2.00 in. (50.8 mm).

5.  Minimum clearance to the side of an Ampgard AR MV MCC.
6.  Minimum front clearance recommended.  In addition, the local 

authority having jurisdiction may also require a larger distance.

7.  Minimum clearance to the rear of an Ampgard AR.
8.  Finished foundation surface shall be level within 1/16 of an in. 

(1.5 mm) in 36 in. (914.4 mm) left-to-right, front-to-back, and 

diagonally.

Table 5.  Minimum installation clearances and torque require-

ments.

Arc 

rating

Exhaust duct 

configurations

Minimum clearance to obstruction

Minimum 

ceiling 

height

Non-seismic

Seismic

Sides

Rear

Sides

Rear

                            Inch (mm)

50 kA

Front, sides, rear

3 (76)

6 (152)

146 (3708)

1. ½ bolt torque requirement 50 ft-lb (68 N·m)

70 ft-lb (95 N·m)

Содержание Ampgard AR

Страница 1: ...istant MVCC and Eaton VacClad switchgear 13 Section 5 Duct and plenum installation 17 5 1 Receiving 17 5 2 Handling 17 5 3 Access to equipment 17 5 4 Exhaust duct 17 5 5 Medium voltage cableways 20 5...

Страница 2: ...starters and reduced voltage starters such as reactor auto transformer and solid state starters Equipment qualified as arc resistant in accordance to IEEE C37 20 7 2017 is intended to provide an addi...

Страница 3: ...continuous current Rated short circuit current withstand 2 second Dielectric withstand Impulse kV rms Amperes Amperes kV rms kV peak Amperes kA rms sym 7 2 1 400 400 18 2 60 1000 1200 2000 3000 50 2 4...

Страница 4: ...the upper fuse mounting behind the service barrier The bottom end of the power fuses are connected to the lower fuse mounting that contain the line side bolted or stab in connections for the main cont...

Страница 5: ...uses and pull the blown fuse indicator down to rest on top of the fuse Ferrell You will hear a click 12 Reposition the service barrier and reinstall the six bolts Tighten until the lock washers are fl...

Страница 6: ...for Eaton s 7 2 kV Ampgard AR arc resistant motor control center Compliant to IEEE C37 20 7 2017 EATON www eaton com Figure 7 Low voltage control compartment Figure 8 Sealing gaskets Isolation switch...

Страница 7: ...an incoming line section may include vertical bus drops to connect the incoming line cables Options for both the top and bottom entry motor cables are available Also included in the main bus enclosur...

Страница 8: ...ment particular to its arc resistant enclosure This document must be used in conjunction with the following instructions specific to the type of starter being installed IB48041 AMPGARD 400 A Motor Sta...

Страница 9: ...t mechanical interlocks Therefore a final inspection is essential before energizing Figure 11 Location of lifting plates After the section has been moved into installation position remove the hooks an...

Страница 10: ...h arc resistant MV MCC vertical section mounting hole location must be considered Consult a licensed structural or civil engineer prior to selecting a mounting system if a system other than that recom...

Страница 11: ...e following ways shown below Figure 13 Exhaust duct exiting the plenum Figure 14 Exhaust duct manifold side s ONLY Figure 15 Closed coupled with Eaton VacClad switchgear Back to back B2B Figure 16 Clo...

Страница 12: ...e July 2021 Instructions for Eaton s 7 2 kV Ampgard AR arc resistant motor control center Compliant to IEEE C37 20 7 2017 EATON www eaton com Figure 14 50 kA arc resistant line up Shown with dual exha...

Страница 13: ...ion must be attached to the switchgear before the plenums are installed Follow the instructions below for coupling the Ampgard AR lineup to the VacClad switchgear 1 Position the Ampgard AR lineup next...

Страница 14: ...E C37 20 7 2017 EATON www eaton com 5 Make all bus splice connections Torque per Table 6 6 Cover all bus connections with the supplied bus boots 7 Replace the covers that were removed in order to acce...

Страница 15: ...July 2021 Instructions for Eaton s 7 2 kV Ampgard AR arc resistant motor control center Compliant to IEEE C37 20 7 2017 EATON www eaton com Figure 17 50 kA arc resistant line up Shown with close coup...

Страница 16: ...2021 Instructions for Eaton s 7 2 kV Ampgard AR arc resistant motor control center Compliant to IEEE C37 20 7 2017 EATON www eaton com Figure 18 50 kA arc resistant line up Shown with close coupled w...

Страница 17: ...ach shipping group Using a four leg bridle sling chain place one hook through each of the four eyes to lift and move the group No leg of the sling shall be at an angle greater than 45 degrees from the...

Страница 18: ...y be used however the support hardware may not be drilled or screwed into the duct Arc duct hanger assembly 69C4455G01 is available from Eaton as shown in the Figure 21 The duct must have a downward s...

Страница 19: ...uction Booklet IB48088 Effective July 2021 Instructions for Eaton s 7 2 kV Ampgard AR arc resistant motor control center Compliant to IEEE C37 20 7 2017 EATON www eaton com Figure 21 Exhaust duct comp...

Страница 20: ...slots Secure it in place with hardware kit 25A4361G12 see Figure 22 The low voltage cableway is built into the plenum It will need two screws and two flat washers from hardware kit 25A4361G12 to compl...

Страница 21: ...the bolts until all the hardware and plenum assemblies are in place Follow the steps below to install the plenum and its accessories 1 Remove the hardware from the front and rear flange of the main bu...

Страница 22: ...C37 20 7 2017 EATON www eaton com Figure 24 Installing the plenums 4 Install the reinforcement angle parts as shown in Figure 25 and Figure 26 5 Use hardware kit 25A4361G10 for the plenum section fro...

Страница 23: ...ctive July 2021 Instructions for Eaton s 7 2 kV Ampgard AR arc resistant motor control center Compliant to IEEE C37 20 7 2017 EATON www eaton com Figure 25 Installing the reinforcement angles Figure 2...

Страница 24: ...op of the gear and then lift the duct collar inside the plenum and install it immediately before installing additional plenum assembly sections e Use 1 4 in 20 bolts lock washers flat washers and nuts...

Страница 25: ...to the top of the plenum 15 Align all the holes of the cableway cutout in the plenum roof with the holes on top flanges of the cableway 16 Only use the middle holes on each side to anchor the cablewa...

Страница 26: ...ter Compliant to IEEE C37 20 7 2017 EATON www eaton com Figure 29 Holes used to attach the MV plenum conduit to the plenum roof 19 Install the arc gas deflector parts as shown in Figure 30 Use hardwar...

Страница 27: ...rd AR vents the hot arc gases produced away from designated areas and the personnel that could be present Personnel cannot be permitted in the arc gas vent area during normal operation The following f...

Страница 28: ...ant motor control center Compliant to IEEE C37 20 7 2017 EATON www eaton com Figure 32 Additional minimum requirements for the arc gas vent area Table 7 Duct end assembly requirements Dimension Duct e...

Страница 29: ...install a 1 4 in 20 nut with locking hardware on the backside of the screw and torque per Table 6 Periodically inspect the air filter on the duct if present and replace if soiled or clogged Section 8...

Страница 30: ...30 Instruction Booklet IB48088 Effective July 2021 Instructions for Eaton s 7 2 kV Ampgard AR arc resistant motor control center Compliant to IEEE C37 20 7 2017 EATON www eaton com Notes...

Страница 31: ...31 Instruction Booklet IB48088 Effective July 2021 Instructions for Eaton s 7 2 kV Ampgard AR arc resistant motor control center Compliant to IEEE C37 20 7 2017 EATON www eaton com Notes...

Страница 32: ...ther contractual agreement between Eaton and the purchaser THERE ARE NO UNDERSTANDINGS AGREEMENTS WARRANTIES EXPRESSED OR IMPLIED INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTAB...

Отзывы: