
INSTALLATION
Eaton 9910 UPS and EBM Installation Guide (6000 VA Models)
S
P-164000007 Rev 1
18
S
Plan the device installation starting from the bottom of the rack
cabinet. Install the heaviest device in the bottom of the rack cabinet.
S
Do not extend more than one device out of the rack cabinet at the
same time.
S
Connect all power cords to properly wired and grounded electrical
outlets.
S
Do not overload the power outlet when you install multiple devices in
the rack cabinet.
UPS Rear Panels
NOTE
The shaded areas shown in the following figures indicate the load segment
groupings. The shading does not appear on the cabinet.
A
L6
−
30P
Input plug
Fan
Ground
screw
REPO
Communication
bay
USB
connector
RS
−
232
connector
Two NEM L6
−
30R
receptacles
(Load segment 2)
EBM connector
Output
circuit breakers
Four IEC 320
−
C19
receptacles (Load segment 1)
Figure 1. The 9910-E66 UPS Rear Panel
Содержание 9910
Страница 1: ...Powerware Series Eaton 9910 UPS and EBM Installation Guide for IBM Applications 6000 VA Models ...
Страница 2: ......
Страница 3: ...Powerware Series Eaton 9910 UPS and EBM Installation Guide for IBM Applications 6000 VA Models ...
Страница 48: ...SERVICE AND SUPPORT Eaton 9910 UPS and EBM Installation Guide 6000 VA Models S P 164000007 Rev 1 40 ...
Страница 49: ......
Страница 50: ... P 1640000071 P 164000007 1 ...