background image

ИБП Eaton 93E 15 kva (93E15KMBSB) - Батарейные кабинеты Eaton 93P, 93E - Пользовательское руководство по установке

Постоянная ссылка на страницу: 

https://eaton-power.ru/catalog/eaton-93e/eaton-93e-15-kva/

Содержание 93E15KMBSB

Страница 1: ...Eaton 93E 15 kva 93E15KMBSB Eaton 93P 93E https eaton power ru catalog eaton 93e eaton 93e 15 kva...

Страница 2: ...Eaton 93P ESMALLandLARGEEXTERNALBATTERYCABINET P 164000427 User s and Installation Guide...

Страница 3: ......

Страница 4: ...Eaton 93P E SMALL and LARGE External Battery Cabinet User s and Installation Guide...

Страница 5: ...al application in the second environment Installation restrictions or additional measures may be needed to prevent disturbances 2013 Eaton Corporation All Rights Reserved The contents of this manual a...

Страница 6: ...ing the Large Battery Cabinet installation 10 2 3 Installation with other than 93PM or 93E UPS 13 3 Maintenance 14 3 1 Important safety instructions 14 3 2 Performing preventive maintenance 15 3 2 1 P...

Страница 7: ...Refer to your operator s manual for additional information such as important operating and maintenance instructions Figure 1 1 Recycling batteries symbol This symbol indicates that you should not dis...

Страница 8: ...hey are defined Icon Description NOTE Information notes call attention to important features or instructions 1 3 General The battery cabinet contains components that carry high currents and voltages T...

Страница 9: ...strings before installation CAUTION Installation or servicing should be performed by qualified service personnel knowledgeable of batteries and required precautions Keep unauthorized personnel away fr...

Страница 10: ...ritten for a global reader NOTE Read the manual before operating or working on the UPS system 1 5 CE marking The product has the CE marking in compliance with the following European directives LV Dire...

Страница 11: ...ange is from 20 to 25 C WARNING Hydrogen and oxygen gases are emitted from batteries into the surrounding atmosphere during charge float charge heavy discharge and overcharge Explosive gas mixture may...

Страница 12: ...n manual for UPS configuration The allowed battery block configurations for 93PM and 93E UPSs are presented in table 2 1 Table 2 1 Battery block configuration for 93PM and 93E UPSs 93PM 30 50 kW 93PM...

Страница 13: ...abinet For the 80 120 kVA models the bottom cable entry is in the front section of the bottom plate and for the 160 200 kVA models the entry is in the rear section of the bottom plate NOTE Installatio...

Страница 14: ...em must be installed on a level floor suitable for computer or electronic equipment The system must be installed in a temperature and humidity controlled indoor area free of conductive contaminants 2...

Страница 15: ...bottom or the rear entry 4 Open the battery cabinet and locate the external power wiring shipped along the cabinet 5 Cables with single insulation are provided with the battery cabinet These cables c...

Страница 16: ...inet placement but for easier service access to UPS on the 93PM 30 150 kW UPS right side is preferred and on the 93PM 160 200 kW left side is preferred The battery cabinet must be located on the right...

Страница 17: ...le glands and or plastic pass through collars accordingly WARNING Make sure all power sources are disconnected before next steps 7 Connect the power cables and signal wires to the UPS No signal wires...

Страница 18: ...ets are to be used repeat the steps for the rest of the cabinets and in 93PM system be sure to daisy chain the signal wire harnesses in the next cabinet 93E system does not use signal wiring Signal wi...

Страница 19: ...ET 13 Revision 2 User s and Installation Guide 2 3 Installation with other than 93PM or 93E UPS Other UPSs may not be fully compatible with 93P E External Battery Cabinet Check UPS manual for the requ...

Страница 20: ...only LETHAL VOLTAGE PRESENT This unit should not be operated with the cabinet doors open or protective panels removed Do not make any assumptions about the electrical state of any cabinet in the UPS s...

Страница 21: ...ons Maintenance procedures should specify that the bolted connections be re torqued 3 2 2 ANNUAL maintenance Annual preventive maintenance should be performed only by authorized service personnel fami...

Страница 22: ...ries may contain HIGH VOLTAGES and CAUSTIC TOXIC and FLAMMABLE substances Batteries can injure or kill people and damage equipment if used improperly DO NOT DISCARD unwanted batteries or battery mater...

Страница 23: ...epresentative Due to continuous product improvement programs specifications are subject to change without notice 4 1 Standards and regulations Safety IEC 62040 1 IEC 60950 1 Performance tests IEC 6204...

Страница 24: ...locks 228 cells per battery string or 3 40 blocks 240 cells per battery string 2V per cell Note Battery strings with different battery quantity and voltage must not be connected in parallel Battery Vo...

Страница 25: ...tenance of the UPS shall also be performed only by a service engineer approved by Eaton Otherwise the warranty will be voided If the product fails to meet its published specifications due to a defect...

Страница 26: ...the UPS to the battery cabinet Note 93PM only Room ventilation and air conditioning equipment are installed and operating correctly The area around the installed UPS system is clean and dust free It...

Страница 27: ...P 164000427 SMALL and LARGE BATTERY CABINET 21 Revision 2 User s and Installation Guide...

Отзывы: