6.3.11 Battery Test
This UPS has a user initiated battery test intended to determine if the batteries are
able to support the load.
The battery test is only able to be initiated when the battery is fully charged. This
normally occurs within 72 hours of the start of a charging cycle. The command will
not be shown if the test is not able to be run.
To start the battery test:
1. Select the CONTROLS symbol on the main menu bar. The System Control screen is displayed.
2. Select Battery on the System Control screen.
3. On the Battery System Control screen, select the RESTING TESTING command, then press the
RETURN pushbutton.
6.3.12 Using the UPS LOAD OFF Command
A UPS Load Off is initiated by the Load Off command on the UPS Control screen. The UPS LOAD OFF controls the
UPS output by powering down the UPS and de-energizing the critical load.
The UPS (including Bypass) remains off until restarted. To
use the LOAD OFF command:
1. Select the CONTROLS symbol on the main menu bar. The System Control screen is displayed.
2. Select UPS on the System Control screen.
3. On the UPS System Control screen, select the NORMAL
LOAD OFF or BYPASS
LOAD OFF
command depending on the UPS mode, then press the RETURN pushbutton.
The Verify Action screen is displayed, providing a choice to proceed or abort the shutdown.
CAUTION
All power to the critical load is lost when the LOAD OFF is selected in the following step. You should use
this feature only when you want to de-energies the critical load.
4. Select Yes or No, then press the RETURN pushbutton.
Selecting Yes will immediately shut down the UPS and de-energizing the critical load. Selecting No will abort the
shutdown.
CAUTION
Do not attempt to restart the system after Load Off until the cause of the shutdown has been identified
and cleared.
5. To restart the UPS after pressing the LOAD OFF pushbutton, follow the procedure in paragraph 6.3.1 or
6.3.2.
WARNING
Power is present inside the UPS cabinet after the upstream input feeder circuit breakers are opened
because of the installed external battery cabinet.
63
Eaton 93E
MK2
UPS (10-40kVA, 380/400/415V) Installation and Operation
Содержание 93E MK2
Страница 1: ...Eaton 93E MK2 UPS 10 40 kVA 380 400 415V Installation and Operation Manual...
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 49: ...Notes 39 Eaton 93E MK2 UPS 10 40kVA 380 400 415V Installation and Operation...
Страница 94: ......
Страница 95: ......
Страница 96: ...614 00389 00...