1.
Create an installation plan for the EBC.
2.
Prepare your site for the EBC.
3.
Inspect and unpack the EBC.
4.
Unload and install the EBC, and wire the system.
5.
Complete the Installation Checklist.
6.
Have authorized service personnel perform preliminary operational checks and start up the system.
NOTE
Startup and operational checks must be performed by an authorized Eaton Customer
Service Engineer, or the warranty terms specified on the product's resources page
become void. See
for details. This service is offered as part of the
sales contract for the UPS. Contact an Eaton service representative in advance (a
minimum two-week notice is required) to reserve a preferred startup date.
33..22
C
Crreeaattiinngg aann IInnssttaallllaattiioonn P
Pllaann
Before installing the EBC, read and understand how this manual applies to the system being installed. Use the
procedures and illustrations in this section to create a logical plan for installing the EBC. This section contains
the following information:
•
Physical features and requirements, including dimensions
•
Power wiring installation notes
•
Location of conduit and wire entry landing plates
•
Location of power terminals
33..33
P
Prreeppaarriinngg tthhee S
Siittee
For the UPS system to operate at peak efficiency, the installation site should meet the environmental
parameters outlined in this manual. If the UPS system is to be operated at an altitude higher than 1500m
(5000 ft), contact an Eaton service representative for important information about high altitude operation. The
operating environment must meet the weight, clearance, and environmental requirements specified for the
applicable accessory cabinet.
33..33..11
EEnnvviirroonnm
meennttaall aanndd IInnssttaallllaattiioonn C
Coonnssiiddeerraattiioonnss
The UPS system installation, including the EBC, must meet the following guidelines:
•
The system must be installed on a level floor suitable for computer or electronic equipment.
•
The system must be installed in a temperature and humidity controlled indoor area free of conductive
contaminants.
Failure to follow guidelines may void your warranty.
The EBC operating environment must meet the weight requirements shown in
and the size
requirements shown in
through
. Dimensions are in millimeters (inches).
Содержание 93E 30EBC
Страница 1: ...p n P 164000057 Revision 05 30EBC and 60EBC Installation Manual Eaton 93E External Battery Cabinet...
Страница 6: ...vi Eaton 93E External Battery Cabinet Installation Manual P 164000057 Rev 05 List of Figures...
Страница 8: ...viii Eaton 93E External Battery Cabinet Installation Manual P 164000057 Rev 05 List of Tables...
Страница 30: ...22 Eaton 93E External Battery Cabinet Installation Manual P 164000057 Rev 05 Installation Plan and Unpacking...
Страница 54: ...46 Eaton 93E External Battery Cabinet Installation Manual P 164000057 Rev 05 Onelines and Schematics...
Страница 60: ...P 16400005705 P 164000057 05...