1.
Remove the I/O bottom entry conduit plate and retain the hardware for later use (see
Figure 22. Section Bottom Entry Landing Conduit Plate
Bottom Entry Conduit
Landing Plate
I/O Section
Ground
NOTE
AC and DC input inter-cabinet power wiring harnesses are secured in the ISBM/PM to
brackets for shipping in the left side of the ISBM section. The shipping brackets can be
removed and discarded after releasing the power wiring.
2.
Disconnect the power wiring harnesses from the ISBM shipping brackets (see
Содержание 9395XC
Страница 8: ......
Страница 16: ...xvi Eaton 9395XC UPS 1200kW 1200kVA 1350kW 1350kVA or 1500kW 1500kVA 164001079 Rev 01 List of Figures ...
Страница 18: ...xviii Eaton 9395XC UPS 1200kW 1200kVA 1350kW 1350kVA or 1500kW 1500kVA 164001079 Rev 01 List of Tables ...
Страница 26: ...8 Eaton 9395XC UPS 1200kW 1200kVA 1350kW 1350kVA or 1500kW 1500kVA 164001079 Rev 01 Introduction ...
Страница 118: ...100 Eaton 9395XC UPS 1200kW 1200kVA 1350kW 1350kVA or 1500kW 1500kVA 164001079 Rev 01 Understanding UPS Operation ...
Страница 160: ...16400107901 164001079 01 ...