Replacement Parts
ITEMS
DESCRIPTION
EATON STYLE NUMBER
SHUNT TRIP KIT (QUICK DISCONNECT)
24Vdc
48Vdc
125Vdc / 120Vac
250Vdc / 240Vac
694C636G04
694C636G01
694C636G02
694C636G03
SHUNT TRIP KIT (RING TERMINALS)
24Vdc
48Vdc
125Vdc / 120Vac
250Vdc / 240Vac
8794C81G14
8794C81G11
8794C81G12
8794C81G13
WARNING
VERIFY CIRCUIT BREAKER IS OPEN, CLOSING SPRINGS ARE
DISCHARGED AND CONTROL POWER IS DISCONNECTED.
REFERENCE: THE SPRING RELEASE COIL IS THE COIL ON THE
LEFT SIDE, LOOKING INTO THE CIRCUIT BREAKER, WITH
THE GREEN “PUSH TO CLOSE” LABEL. THE SHUNT TRIP
COIL IS THE COIL ON THE RIGHT SIDE, LOOKING INTO THE
CIRCUIT BREAKER, WITH THE RED “PUSH TO OPEN” LABEL.
Installation of Second Shunt Trip
Make sure all warnings are adhered to and circuit
breaker is closed and discharged.
Make sure area is prepared for installation of 2nd Shunt
Trip, move wires down out of the way.
otee:
N
Routing of wires, make sure 2nd Shunt trip wires route
the same way.
Place aluminum shim on back of 2nd shunt trip as
shown.
Hold shim in place while you begin installation.
Make sure wires are routed through the same opening
as the existing.
Install 2nd Shunt Trip next to existing Push to Open
Assembly as shown, hand tighten center bolt. Make
sure aluminum shim does not fall out. Make sure steel
brackets that stick out to the left are properly oriented as
shown.
Install .312-18 X .625 socket head capscrew in lower
right hole in 2nd Shunt Trip Bracket as shown. This uses
a .250-20 Hex Allen Wrench.
Tighten socket head capscrew as shown, making sure
aluminum shim is still in place. Tighten center .312-18
hex bolt using a ½” or 13mm socket or wrench.
Attach wires to the 5th and 6th location on the terminal
block as shown. Use wire ties as needed to bundle
wires together so they do not interfere with other
components.
Component
Installation
Installing a second shunt trip coil on a 150VCP-W25 mechanism.
11
EATON
|