EasyPro Vianti Falls HB11K Скачать руководство пользователя страница 2

If the 

lighting 

option is 

purchased 

the LED light 

strip can be fitted into the 

back of the spillway. There are brackets on the 

ends of the light bars with holes in them.

These brackets are for other applications.

The LED light bar should fit snuggly into the 

back of the spillway. If necessary, a small 

amount of silicone can be used as an adhesive 

to hold the bar in place.

1 

Determine the 

placement of 

the Vianti Falls 

system. Prepare 

the base for 

the 24" x 29

1

/

2

"

 

basin by properly 

compacting 

and leveling the 

area. The Vianti 

Falls spillway 

is designed 

to be placed 

approximately 

12" to 30" above the basin. The center of the 

spillway and the basin must be aligned. The 

spillway must be positioned in the wall to allow 

for the lip to protrude past the wall at least 

1

1

/

4

" (assuming the wall is plumb). This is to 

ensure water will land in the 6" x 19" splash mat 

included with the basin.

When building 

the block wall, 

a section of wall 

must be left out 

to accommodate 

the plumbing and 

electrical cord for the 

pump. 

Hole for 

Plumbing 

and Pump 

Power Cord

3 

Once the spillway 

placement has 

been determined in the 

block wall, the block 

will need to be cut to 

allow for the plumbing 

connections on the 

back of the spillway. 

Use appropriate tools 

and extreme care when 

cutting block. Consult 

block manufacturer recommendations for 

properly cutting block being used.

The block that 

goes around the 

spillway will need 

to be cut to ensure 

proper leveling and 

look of the spillway 

in the wall. The type 

of block being used 

will determined the 

methods used. A lentil 

may be required for longer spillways or in walls 

that would require additional weight bearing 

support. Consult a qualified professional for 

specific installation requirements and codes.

The spillway should be “dry fit” to ensure the 

spillway is level from side to side and front to back.

Once the spillway 

is level and “dry fit” 

the plumbing can now 

be fitted. Use the 1" 

PVC male adaptor and 

the fittings provided 

to connect spillway to 

the flexible PVC pipe. 

Wrap the threads of the 

PVC male adaptor with 

Teflon tape and thread into the spillway inlet(s). 

Determine the placement of additional fittings 

(elbows, tees, and extra pipe). Cut and glue all 

the pieces together to fit the application.

The cord for the 

LED light strip can 

be tucked into the 

notch in the spillway. 

A dab of silicone 

should be used to seal 

the notch on opposing 

side. Tuck the cord 

between the blocks to run the cord to the power 

source.

Run the 1" black 

flexible PVC through 

the hole previously 

provided in the block 

wall. Carefully measure 

and cut PVC pipe to 

proper length. Take 

extra care to verify the 

spillway has remained 

in its level position 

while measuring and cutting the pipe.

1

1

/

4

"

Splash

Mat

Содержание Vianti Falls HB11K

Страница 1: ... 1 EP850 3 yr warranty 16 cord LED Light 15 cord with 10 watt transformer HB11K EX No light HB11KB EX LED11CB blue light HB11KW EX LED11WW white light 1 Flexible black PVC pipe 6 Pump discharge assembly with ball valve 1 PVC Glue 4 oz 1 1 PVC male adaptor mpt x slip 1 1 PVC 90 deg elbow slip x slip 1 3 4 Bulkhead fitting 1 3 4 Swivel Fitting fht x mpt 1 3 4 x 1 Reducing Male Adapter mpt x slp 1 Ma...

Страница 2: ...ing block Consult block manufacturer recommendations for properly cutting block being used 5 The block that goes around the spillway will need to be cut to ensure proper leveling and look of the spillway in the wall The type of block being used will determined the methods used A lentil may be required for longer spillways or in walls that would require additional weight bearing support Consult a q...

Страница 3: ...the pump cover in place The power cord for the pump can run through the notch in the pump cover The pump cover can be placed in position as shown or reversed Place the splash mat underneath the waterfall 14Finish construction of the block wall and any other decorative stone covering the basin Be sure to leave rock off the area of the splash mat on the basin where the water naturally wants to fall ...

Страница 4: ...e installation or removal of the Product subject to a warranty claim All returned items will be inspected to determine cause of failure before a warranty claim is approved The exclusive remedies provided hereunder shall upon EasyPro s inspection and option be either repair or replacement of the Product or parts covered under this warranty Making a Claim A Return Authorization RA number must first ...

Отзывы: